Browse
Subjects
Records with Subject: Planning & Scheduling
1203. LAPSE:2021.0594
Synthesis of European Union Biorefinery Supply Networks Considering Sustainability Objectives
July 12, 2021 (v1)
Subject: Planning & Scheduling
Keywords: 2030 target, biorefinery supply network, European Union, mathematical programming, production of biofuels, Renewable and Sustainable Energy, sustainability profit
Increasing the use of renewable energy sources is one of the most important goals of energy policies in several countries to build a sustainable energy future. This contribution proposes the synthesis of a biorefinery supply network for a case study of the European Union (EU-27) under several scenarios based on a mathematical programming approach. Several biomass and waste sources, such as grains, waste oils, and lignocellulosics, are proposed to be utilized, and various biofuels including first, second, and third generations are produced such as bioethanol, green gasoline, biodiesel, Fischer Tropsch (FT) diesel, and hydrogen. The aim of this study is to evaluate the capabilities of EU-27 countries to be able to meet the Renewable Energy Directive (RED II) target regarding the share of renewable energy in the transport sector by 2030 in each Member State while not compromising the current production of food. A generic mathematical model has been developed for the multi-period optimizat... [more]
1204. LAPSE:2021.0547
Quality Inspection Plan for Imperfect Production System with Assembly Configuration
June 21, 2021 (v1)
Subject: Planning & Scheduling
Keywords: assemble to order, imperfect production system, quality inspection
In this study, the model concerning a negative binomial sampling inspection plan is proposed and applied to an imperfect production system with assemble-to-order configuration, where the production system is subject to a Weibull deteriorating process and is operated under an in-control or an out-of-control state. The proposed model of this study contributes to developing an approach which can effectively integrate the considerations of the production system status, the defective rate, the working efficiency of employees, and the market demands with an aim to determine the optimal number of conforming items for inspection with minimum total cost, and the results can be practically applied to the assembly of products in various industries, especially for the prevalent Industry 4.0 in manufacturing.
1205. LAPSE:2021.0506
An Agricultural Products Supply Chain Management to Optimize Resources and Carbon Emission Considering Variable Production Rate: Case of Nonperishable Corps
June 10, 2021 (v1)
Subject: Planning & Scheduling
Keywords: agri-supply chain management, eco-efficient production, imperfect production, optimal resources, variable production rate
The management of the man−machine interaction is essential to achieve a competitive advantage among production firms and is more highlighted in the processing of agricultural products. The agricultural industry is underdeveloped and requires a transformation in technology. Advances in processing agricultural products (agri-product) are essential to achieve a smart production rate with good quality and to control waste. This research deals with modelling of a controllable production rate by a combination of the workforce and machines to minimize the total cost of production. The optimization of the carbon emission variable and management of the imperfection in processing makes the model eco-efficient. The perishability factor in the model is ignored due to the selection of a single sugar processing firm in the supply chain with a single vendor for the pragmatic application of the proposed research. A non-linear production model is developed to provide an economic benefit to the firms in... [more]
1206. LAPSE:2021.0439
Sustainable Production−Inventory Model in Technical Cooperation on Investment to Reduce Carbon Emissions
May 26, 2021 (v1)
Subject: Planning & Scheduling
Keywords: carbon cap-and-trade, carbon tax, sustainable production–inventory model
Carbon cap-and-trade and carbon offsets are common and important carbon emission reduction policies in many countries. In addition, carbon emissions from business activities can be effectively reduced through specific capital investments in green technologies. Nevertheless, such capital investments are costly and not all enterprises can afford these investments. Therefore, if all members of a supply chain agree to share the investments in the facilities, the supply chain can reduce carbon emissions and generate more profit. Under carbon cap-and-trade and carbon tax policies, this study proposes a production−inventory model in which the buyer and vendor in the integrated supply chain agree to co-invest funds to reduce carbon emissions. We planned to integrate production, delivery, replenishment, and technology to reduce carbon emissions so as to maximize the total profit of the supply chain system. Several examples are simulated and the sensitivity analysis of the main parameters is car... [more]
1207. LAPSE:2021.0399
Minimizing Tardiness Penalty Costs in Job Shop Scheduling under Maximum Allowable Tardiness
May 25, 2021 (v1)
Subject: Planning & Scheduling
Keywords: job shop scheduling, maximum allowable tardiness, probabilistic dispatching rules, semiconductor, tardiness penalty
In many manufacturing or service industries, there exists maximum allowable tardiness for orders, according to purchase contracts between the customers and suppliers. Customers may cancel their orders and request compensation for damages, for breach of contract, when the delivery time is expected to exceed maximum allowable tardiness, whereas they may accept the delayed delivery of orders with a reasonable discount of price within maximum allowable tardiness. Although many research works have been produced on the job shop scheduling problem relating to minimizing total tardiness, none of them have yet considered problems with maximum allowable tardiness. In this study, we solve a job shop scheduling problem under maximum allowable tardiness, with the objective of minimizing tardiness penalty costs. Two kinds of penalty costs are considered, i.e., one for tardy jobs, and the other for canceled jobs. To deal with this problem within a reasonable time at actual production facilities, we p... [more]
1208. LAPSE:2021.0320
A Joint Optimization Strategy of Coverage Planning and Energy Scheduling for Wireless Rechargeable Sensor Networks
April 30, 2021 (v1)
Subject: Planning & Scheduling
Keywords: coverage optimization, Particle Swarm Optimization, queuing game, virtual force, wireless rechargeable sensor network
Wireless Sensor Networks (WSNs) have the characteristics of large-scale deployment, flexible networking, and many applications. They are important parts of wireless communication networks. However, due to limited energy supply, the development of WSNs is greatly restricted. Wireless rechargeable sensor networks (WRSNs) transform the distributed energy around the environment into usable electricity through energy collection technology. In this work, a two-phase scheme is proposed to improve the energy management efficiency for WRSNs. In the first phase, we designed an annulus virtual force based particle swarm optimization (AVFPSO) algorithm for area coverage. It adopts the multi-parameter joint optimization method to improve the efficiency of the algorithm. In the second phase, a queuing game-based energy supply (QGES) algorithm was designed. It converts energy supply and consumption into network service. By solving the game equilibrium of the model, the optimal energy distribution str... [more]
1209. LAPSE:2021.0238
Material Requirements Planning Using Variable-Sized Bin-Packing Problem Formulation with Due Date and Grouping Constraints
April 27, 2021 (v1)
Subject: Planning & Scheduling
Keywords: bin-packing problem, material requirements planning, mixed-integer linear programming
Correct planning is crucial for efficient production and best quality of products. The planning processes are commonly supported with computer solutions; however manual interactions are commonly needed, as sometimes the problems do not fit the general-purpose planning systems. The manual planning approach is time consuming and prone to errors. Solutions to automatize structured problems are needed. In this paper, we deal with material requirements planning for a specific problem, where a group of work orders for one product must be produced from the same batch of material. The presented problem is motivated by the steel-processing industry, where raw materials defined in a purchase order must be cut in order to satisfy the needs of the planned work order while also minimizing waste (leftover) and tardiness, if applicable. The specific requirements of the problem (i.e., restrictions of which work orders can be produced from a particular group of raw materials) does not fit the regular p... [more]
1210. LAPSE:2021.0227
Decision-Making of Port Enterprise Safety Investment Based on System Dynamics
April 27, 2021 (v1)
Subject: Planning & Scheduling
Keywords: decision-making, port enterprises, safety investment, SD
Safety is the premise of efficiency and effectiveness in the port operation. Safety investment is becoming a vital part of port operation in current era in order to overcome different types of hazards the port operation exposed to. This paper aims to improve the safety level of port operation through analyzing its influencing factors and exploring the interactions between the safety investment and system risk level. By analyzing the key factors affecting the port operation and their mutual relationship within a man−machine−environment−management system, a decision-making model of safety investment in port enterprise was established by system dynamics (SD). An illustration example and a sensitivity analysis were carried out to justify and validate the proposed model. The results show that increasing the total safety investment of port enterprises, improving the safety management investment on personnel, and strengthening the implementation effect of investment can improve the degree of... [more]
1211. LAPSE:2021.0181
Carbon-Efficient Production Scheduling of a Bioethanol Plant Considering Diversified Feedstock Pelletization Density: A Case Study
April 16, 2021 (v1)
Subject: Planning & Scheduling
Keywords: bioethanol plant, carbon emission, dual-objective optimization, Scheduling
This paper presents a dual-objective optimization model for production scheduling of bioethanol plant with carbon-efficient strategies. The model is developed throughout the bioethanol production process. Firstly, the production planning and scheduling of the bioethanol plant’s transportation, storage, pretreatment, and ethanol manufacturing are fully considered. Secondly, the carbon emissions in the ethanol manufacturing process are integrated into the model to form a dual-objective optimization model that simultaneously optimizes the production plan and carbon emissions. The effects of different biomass raw materials with optional pelletization density and pretreatment methods on production scheduling are analyzed. The influence of demand and pretreatment cost on selecting a pretreatment method and total profit is considered. A membership weighted method is developed to solve the dual-objective model. The carbon emission model and economic model are integrated into one model for anal... [more]
1212. LAPSE:2021.0055
Assessing Supply Chain Performance from the Perspective of Pakistan’s Manufacturing Industry Through Social Sustainability
February 22, 2021 (v1)
Subject: Planning & Scheduling
Keywords: Pakistan, qualitative research, social sustainability, sustainable supply chain management (SSSCM)
The industry is gradually forced to integrate socially sustainable development practices and cross-social issues. Although researchers and practitioners emphasize environmental and economic sustainability in supply chain management (SCM). This is unfortunate because not only social sustainable development plays an important role in promoting other sustainable development programs, but social injustice at one level in the supply chain may also cause significant losses to companies throughout the chain. This article aimed to consolidate the literature on the responsibilities of suppliers, manufacturers, and customers and to adopt sustainable supply chain management (SSSCM) practices in the Pakistani industry to identify all possible aspects of sustainable social development in the supply chain by investigating the relationship between survey variables and structure. This work went beyond the limits of regulations and showed the status of maintaining sustainable social issues. Based on se... [more]
1213. LAPSE:2021.0038
Exploring E-Waste Resources Recovery in Household Solid Waste Recycling
February 22, 2021 (v1)
Subject: Planning & Scheduling
Keywords: household solid waste, metal recovery value, socio-economic benefits, waste composition of Karachi-Pakistan, waste management, waste recycling
The ecosystem of earth, the habitation of 7.53 billion people and more than 8.7 million species, is being imbalanced by anthropogenic activities. The ever-increasing human population and race of industrialization is an exacerbated threat to the ecosystem. At present, the global average waste generation per person is articulated as 494 kg/year, an enormous amount of household waste (HSW) that ultimately hits 3.71×1012 kg of waste in one year. The ultimate destination of HSW is a burning issue because open dumping and burning as the main waste treatment and final disposal systems create catastrophic environmental limitations. This paper strives to contribute to this issue of HSW management that matters to everyone’s business, specifically to developing nations. The HSW management system of the world’s 12th largest city and 24th most polluted city, Karachi, was studied with the aim of generating possible economic gains by recycling HSWs. In this regard, the authors surveyed dumping sites... [more]
1214. LAPSE:2021.0015
Scheduling Two Identical Parallel Machines Subjected to Release Times, Delivery Times and Unavailability Constraints
February 3, 2021 (v1)
Subject: Planning & Scheduling
Keywords: Cmax, delivery times, genetic algorithm (GA), Optimization, parallel machine scheduling, preventive maintenance, release times
This paper proposes a genetic algorithm (GA) for scheduling two identical parallel machines subjected to release times and delivery times, where the machines are periodically unavailable. To make the problem more practical, we assumed that the machines are undergoing periodic maintenance rather than making them always available. The objective is to minimize the makespan (Cmax). A lower bound (LB) of the makespan for the considered problem was proposed. The GA performance was evaluated in terms of the relative percentage deviation (RPD) (the relative distance to the LB) and central processing unit (CPU) time. Response surface methodology (RSM) was used to optimize the GA parameters, namely, population size, crossover probability, mutation probability, mutation ratio, and pressure selection, which simultaneously minimize the RPD and CPU time. The optimized settings of the GA parameters were used to further analyze the scheduling problem. Factorial design of the scheduling problem input v... [more]
1215. LAPSE:2021.0004
Simulation-Based Optimization of a Two-Echelon Continuous Review Inventory Model with Lot Size-Dependent Lead Time
February 3, 2021 (v1)
Subject: Planning & Scheduling
Keywords: Arena, dependent lead time, simulation-based optimization, stochastic inventory problem
This study analyzes a stochastic continuous review inventory system (Q,r) using a simulation-based optimization model. The lead time depends on lot size, unit production time, setup time, and a shop floor factor that represents moving, waiting, and lot size inspection times. A simulation-based model is proposed for optimizing order quantity (Q) and reorder point (r) that minimize the total inventory costs (holding, backlogging, and ordering costs) in a two-echelon supply chain, which consists of two identical retailers, a distributor, and a supplier. The simulation model is created with Arena software and validated using an analytical model. The model is interfaced with the OptQuest optimization tool, which is embedded in the Arena software, to search for the least cost lot sizes and reorder points. The proposed model is designed for general demand distributions that are too complex to be solved analytically. Hence, for the first time, the present study considers the stochastic invento... [more]
1216. LAPSE:2020.1186
Real-Time Decision-Support System for High-Mix Low-Volume Production Scheduling in Industry 4.0
December 17, 2020 (v1)
Subject: Planning & Scheduling
Keywords: decision-support system, HMLV production, Industry 4.0, real-time production-scheduling techniques, risk analysis, RPA
Numerous organizations are striving to maximize the profit of their businesses by the effective implementation of competitive advantages including cost reduction, quick delivery, and unique high-quality products. Effective production-scheduling techniques are methods that many firms use to attain these competitive advantages. Implementing scheduling techniques in high-mix low-volume (HMLV) manufacturing industries, especially in Industry 4.0 environments, remains a challenge, as the properties of both parts and processes are dynamically changing. As a reaction to these challenges in HMLV Industry 4.0 manufacturing, a newly advanced and effective real-time production-scheduling decision-support system model was developed. The developed model was implemented with the use of robotic process automation (RPA), and it comprises a hybrid of different advanced scheduling techniques obtained as the result of analytical-hierarchy-process (AHP) analysis. The aim of this research was to develop a... [more]
1217. LAPSE:2020.1150
A Process-Based Modeling Method for Describing Production Processes of Ship Block Assembly Planning
November 9, 2020 (v1)
Subject: Planning & Scheduling
Keywords: block assembly planning, process-based modeling, production process, ship production, shipbuilding manufacturing
Ship block assembly planning is very complex due to the various activities and characteristics of ship production. Therefore, competitiveness in the shipbuilding industry depends on how well a company operates its ship block assembly plan. Many shipbuilders are implementing various studies to improve their competitiveness in ship block assembly planning, specifically regarding technology usage, such as modeling and simulation (M&S) and Cyber-Physical Systems (CPS). Although these technologies are successfully applied in some production planning systems, it is difficult to tailor ship production planning systems with flexibility due to unexpected situations. Providing a flexible plan for these production planning systems requires a way to describe and review the organic relationships of ship production processes. In this research, a process-based modeling (PBM) method proposes a novel approach to describing the production process of ship block assembly planning by redefining production... [more]
1218. LAPSE:2020.1108
Multi-Objective Optimization of Workshop Scheduling with Multiprocess Route Considering Logistics Intensity
November 9, 2020 (v1)
Subject: Planning & Scheduling
Keywords: logistics intensity, multi-objective optimization, multiprocess route, workshop scheduling
In order to solve the problems of flexible process route and workshop scheduling scheme changes frequently in the multi-variety small batch production mode, a multiprocess route scheduling optimization model with carbon emissions and cost as the multi-objective was established. At the same time, it is considered to optimize under the existing machine tool conditions in the workshop, then the theory of logistics intensity between equipment is introduced into the model. By designing efficient constraints to ensure reasonable processing logic, and then applying multilayer coding genetic algorithm to solve the case. The optimization results under single-target and multi-target conditions are contrasted and analyzed, so as to guide enterprises to choose a reasonable scheduling plan, improve the carbon efficiency of the production line, and save costs.
1219. LAPSE:2020.1055
Capacitated Lot-Sizing Problem with Sequence-Dependent Setup, Setup Carryover and Setup Crossover
October 26, 2020 (v1)
Subject: Planning & Scheduling
Keywords: branch-and-cut algorithm, capacitated lot-sizing, sequence-dependent setup, setup carryover, setup crossover
Since setup operations have significant impacts on production environments, the capacitated lot-sizing problem considering arbitrary length of setup times helps to develop flexible and efficient production plans. This study discusses a capacitated lot-sizing problem with sequence-dependent setup, setup carryover and setup crossover. A new mixed integer programming formulation is proposed. The formulation is based on three building blocks: the facility location extended formulation; the setup variables with indices for the starting and the completion time periods; and exponential number of generalized subtour elimination constraints (GSECs). A separation routine is adopted to generate the violated GSECs. Computational experiments show that the proposed formulation outperforms models from the literature.
1220. LAPSE:2020.1012
Optimal Scheduling of Island Microgrid with Seawater-Pumped Storage Station and Renewable Energy
September 23, 2020 (v1)
Subject: Planning & Scheduling
Keywords: island microgrid, optimal scheduling, renewable energy resources, seawater-pumped storage station
The rapid development of renewable energy, represented by wind and photovoltaic, provides a new solution for island power supplies. However, due to the intermittent and random nature of renewable energy, a microgrid needs energy-storage components to stabilize its power supply when coupled with them. The emergence of seawater-pumped storage stations provides a new method to offset the shortage of island power supply. In this study, an optimal scheduling of island microgrid is proposed, which uses seawater-pumped storage station as the energy storage equipment to cooperate with wind, photovoltaic and diesel generator. First, a mathematic formulation of seawater-pumped storage station with renewable energy is presented. Then, to reach the goal of economic dispatch, an optimal scheduling model of island microgrid is established with the consideration of both respective operation constraints and island load requirements. Finally, the effectiveness of the proposed model is verified by an is... [more]
1221. LAPSE:2020.0992
Supplier Selection for the Adoption of Green Innovation in Sustainable Supply Chain Management Practices: A Case of the Chinese Textile Manufacturing Industry
September 23, 2020 (v1)
Subject: Planning & Scheduling
Keywords: FAHP, FTOPSIS, green innovation, manufacturing industry, MCDM, supplier selection, sustainable supply chain management
Globally, increasing environmental issues are gaining attention to facilitate the adoption of green innovation for sustainable supply chain management (SSCM). Sustainable environmental practices have been well-considered in the literature; however, no study has focused on adopting green innovation practices for sustainable development. Thus, environmental management authorities are putting pressure on industries to implement green innovation criteria for SSCM operations. Moreover, it is important to select traditional suppliers to transform its practices to that of sustainable supply chains in order to achieve the industry’s sustainable supply chain goals. In response, this research identified and analyzed the green innovation criteria for SSCM and then selected a supplier that could implement green aspects in the SSCM. This study developed an integrated multi-criteria decision making (MCDM) model using the fuzzy analytical hierarchy process (FAHP) and the fuzzy technique for order of... [more]
1222. LAPSE:2020.0980
A Review of the Criteria and Methods of Reverse Logistics Supplier Selection
September 23, 2020 (v1)
Subject: Planning & Scheduling
Keywords: MCDM, reverse logistics, supplier selection, Sustainability
This article presents a literature review on reverse logistics (RL) supplier selection in terms of criteria and methods. A systematic view of past work published between 2008 and 2020 on Web of Science (WOS) databases is provided by reviewing, categorizing, and analyzing relevant papers. Based on the analyses of 41 articles, we propose a three-stage typology of decision-making frameworks to understanding RL supplier selection, including (a) establishment of the selection criteria; (b) calculation of the relative weights and ranking of the selection criteria; (c) ranking of alternatives (suppliers). The main discoveries of this review are as follows. (1) Attention to the field of RL supplier selection is increasing, as evidenced by the increasing number of papers in the field. With the adaption of circular economy legislation and the need resource and business resilience, it is expected that RL and RL supplier selection will be a hot topic in the near future. (2) A large number of paper... [more]
1223. LAPSE:2020.0935
Analysis of the Installed Productive Capacity in a Medical Angiography Room through Discrete Event Simulation
August 29, 2020 (v1)
Subject: Planning & Scheduling
Keywords: discrete events simulation, healthcare engineering, hospital management, installed productive capacity, process model
The installed productive capacity of a healthcare center’s equipment limits the efficient use of its resources. This paper, therefore, analyzes the installed productive capacity of a hospital angiography room and how to optimize patient demand. For this purpose, a Discrete Event Simulation (DES) model based on historical variables from the current system was created using computer software. The authors analyzed 2044 procedures performed between 2014 and 2015 in a hospital in San José, Costa Rica. The model was statistically validated to determine that it does not significantly differ from the current system, considering the DMAIC stages for continuous process improvement. In the current scenario, resource utilization is 0.99, and the waiting list increases every month. The results showed that the current capacity of the service could be doubled, and that resource utilization could be reduced to 0.64 and waiting times by 94%. An increase in service efficiency could be achieved by shorte... [more]
1224. LAPSE:2020.0884
A Data-Driven-Based Industrial Refrigeration Optimization Method Considering Demand Forecasting
July 17, 2020 (v1)
Subject: Planning & Scheduling
Keywords: Compressors, data-driven, Energy Efficiency, industrial process modelling, multi-layer perceptron, partial load ratio, refrigeration systems, self-organizing maps
One of the main concerns of industry is energy efficiency, in which the paradigm of Industry 4.0 opens new possibilities by facing optimization approaches using data-driven methodologies. In this regard, increasing the efficiency of industrial refrigeration systems is an important challenge, since this type of process consume a huge amount of electricity that can be reduced with an optimal compressor configuration. In this paper, a novel data-driven methodology is presented, which employs self-organizing maps (SOM) and multi-layer perceptron (MLP) to deal with the (PLR) issue of refrigeration systems. The proposed methodology takes into account the variables that influence the system performance to develop a discrete model of the operating conditions. The aforementioned model is used to find the best PLR of the compressors for each operating condition of the system. Furthermore, to overcome the limitations of the historical performance, various scenarios are artificially created to fin... [more]
1225. LAPSE:2020.0828
Two-Layer Optimization Model for the Siting and Sizing of Energy Storage Systems in Distribution Networks
July 17, 2020 (v1)
Subject: Planning & Scheduling
Keywords: energy storage system, fuzzy entropy weight, multi-objective optimization, optimal sizing and siting, vague set
One of the most important issues that must be taken into consideration during the planning of energy storage systems (ESSs) is improving distribution network economy, reliability, and stability. This paper presents a two-layer optimization model to determine the optimal siting and sizing of ESSs in the distribution network and their best compromise between the real power loss, voltage stability margin, and the application cost of ESSs. Thereinto, an improved bat algorithm based on non-dominated sorting (NSIBA), as an outer layer optimization model, is employed to obtain the Pareto optimal solution set to offer a group of feasible plans for an internal optimization model. According to these feasible plans, the method of fuzzy entropy weight of vague set, as an internal optimization model, is applied to obtain the synthetic priority of Pareto solutions for planning the optimal siting and sizing of ESSs. By this means, the adopted fuzzy entropy weight method is used to obtain the objectiv... [more]
1226. LAPSE:2020.0782
Modeling the Municipal Waste Collection Using Genetic Algorithms
July 2, 2020 (v1)
Subject: Planning & Scheduling
Keywords: genetic algorithms, traveling salesman problem, waste collection route planning
Calculating adequate vehicle routes for collecting municipal waste is still an unsolved issue, even though many solutions for this process can be found in the literature. A gap still exists between academics and practitioners in the field. One of the apparent reasons why this rift exists is that academic tools often are not easy to handle and maintain by actual users. In this work, the problem of municipal waste collection is modeled using a simple but efficient and especially easy to maintain solution. Real data have been used, and it has been solved using a Genetic Algorithm (GA). Computations have been done in two different ways: using a complete random initial population, and including a seed in this initial population. In order to guarantee that the solution is efficient, the performance of the genetic algorithm has been compared with another well-performing algorithm, the Variable Neighborhood Search (VNS). Three problems of different sizes have been solved and, in all cases, a s... [more]
1227. LAPSE:2020.0773
Synthesis of Large-Scale Bio-Hydrogen Network Using Waste Gas from Landfill and Anaerobic Digestion: A P-Graph Approach
July 2, 2020 (v1)
Subject: Planning & Scheduling
Keywords: graph theoretic, hydrogen production, optimisation, Process Synthesis, Renewable and Sustainable Energy
Due to the expanding concern on cleaner production and sustainable development aspects, a technology shift is needed for the hydrogen production, which is commonly derived from natural gas. This work aims to synthesise a large-scale bio-hydrogen network in which its feedstock, i.e., bio-methane, is originated from landfill gas and palm oil mill effluent (POME). Landfill gas goes through a biogas upgrader where high-purity bio-methane is produced, while POME is converted to bio-methane using anaerobic digestor (AD). The generated bio-methane is then distributed to the corresponding hydrogen sink (e.g., oil refinery) through pipelines, and subsequently converted into hydrogen via steam methane reforming (SMR) process. In this work, P-graph framework is used to determine a supply network with minimum cost, while ensuring the hydrogen demands are satisfied. Two case studies in the West and East Coasts of Peninsular Malaysia are used to illustrate the feasibility of the proposed model. In C... [more]
[Show All Subjects]
[0.04 s]

