Feasibility of 10 MW Biomass-Fired Power Plant Used Rice Straw in Cambodia
February 23, 2023
Abstract
This study investigates the feasibility of rice straw for energy production in Cambodia. The potential areas for a 10 MW biomass-fired power plant installation are estimated based on rice straw availability displayed in a graphic information system (GIS). The discounted cash flow (DCF) method on the profitability index (PI) was executed by Mathlab software, which was used to determine the period of the power plant profitability. The reduction of CO and CO2 emissions from the proposed rice straw biomass-fired power plant with 10 MW capacity was calculated and compared with the coal-fired power plant and open field burning. Prey Veng, Takeo, and Battambang are potential provinces that have an estimated rice straw source of 804,796 t/annum, 720,040 t/annum, and 603,273 t/annum, respectively. Within a 20-year project, the biomass-fired power plant can reach profitability between six and ten years with the operation of the rice-straw price of 20 USD/t to 40 USD/t. The total energy produced by these potential areas is 1251 GWh/annum, with a CO2 emission avoidance of 1.06 million t/annum compared to the coal-fired power plant operation. Simultaneously, the emission savings of the biomass-fired power plant compared to open-field burning are 0.61 million t/annum of CO2 and 0.02 million t/annum of CO in the study site. The findings are prospectively essential for further designing of a small-scale biomass-fired power plant in Cambodia.
This study investigates the feasibility of rice straw for energy production in Cambodia. The potential areas for a 10 MW biomass-fired power plant installation are estimated based on rice straw availability displayed in a graphic information system (GIS). The discounted cash flow (DCF) method on the profitability index (PI) was executed by Mathlab software, which was used to determine the period of the power plant profitability. The reduction of CO and CO2 emissions from the proposed rice straw biomass-fired power plant with 10 MW capacity was calculated and compared with the coal-fired power plant and open field burning. Prey Veng, Takeo, and Battambang are potential provinces that have an estimated rice straw source of 804,796 t/annum, 720,040 t/annum, and 603,273 t/annum, respectively. Within a 20-year project, the biomass-fired power plant can reach profitability between six and ten years with the operation of the rice-straw price of 20 USD/t to 40 USD/t. The total energy produced by these potential areas is 1251 GWh/annum, with a CO2 emission avoidance of 1.06 million t/annum compared to the coal-fired power plant operation. Simultaneously, the emission savings of the biomass-fired power plant compared to open-field burning are 0.61 million t/annum of CO2 and 0.02 million t/annum of CO in the study site. The findings are prospectively essential for further designing of a small-scale biomass-fired power plant in Cambodia.
Record ID
Keywords
Biomass, biomass energy, Cambodia, CO2 emission, rice straw
Subject
Suggested Citation
Sokrethya S, Aminov Z, Van Quan N, Xuan TD. Feasibility of 10 MW Biomass-Fired Power Plant Used Rice Straw in Cambodia. (2023). LAPSE:2023.6197
Author Affiliations
Sokrethya S: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan; Division of Distributive and Business, Electricité du Cambodge, Phnom Penh
Aminov Z: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan
Van Quan N: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan [ORCID]
Xuan TD: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan; Center for the Planetary Health and Innovation Science (PHIS), The IDEC Inst [ORCID]
Aminov Z: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan
Van Quan N: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan [ORCID]
Xuan TD: Transdisciplinary Science and Engineering Program, Graduate School of Advanced Science and Engineering, Hiroshima University, 1-5-1 Kagamiyama, Higashi-Hiroshima 739-8529, Japan; Center for the Planetary Health and Innovation Science (PHIS), The IDEC Inst [ORCID]
Journal Name
Energies
Volume
16
Issue
2
First Page
651
Year
2023
Publication Date
2023-01-05
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en16020651, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.6197
This Record
External Link

https://doi.org/10.3390/en16020651
Publisher Version
Download
Meta
Record Statistics
Record Views
338
Version History
[v1] (Original Submission)
Feb 23, 2023
Verified by curator on
Feb 23, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.6197
Record Owner
Auto Uploader for LAPSE
Links to Related Works
[1.01 s]