LAPSE:2024.0099
Published Article
LAPSE:2024.0099
A State Transition Diagram and an Artificial Physarum polycephalum Colony Algorithm for the Flexible Job Shop Scheduling Problem with Transportation Constraints
Zhengying Cai, Yihang Feng, Shanshan Yang, Jia Yang
January 12, 2024
In many flexible job shop scheduling problems, transportation scheduling problems are involved, increasing the difficulty in problem-solving. Here, a novel artificial Physarum polycephalum colony algorithm is proposed to help us address this problem. First, the flexible job shop scheduling problem with transportation constraints is modeled as a state transition diagram and a multi-objective function, where there are ten states in total for state transition, and the multi-objective function considers the makespan, average processing waiting time, and average transportation waiting time. Second, a novel artificial Physarum polycephalum colony algorithm is designed herein with two main operations: expansion and contraction. In the expansion operation, each mycelium can cross with any other mycelia and generate more offspring mycelia, of which each includes multiple pieces of parental information, so the population expands to more than twice its original size. In the contraction operation, a fast grouping section algorithm is designed to randomly group all mycelia according to the original population size, where each group selects the best fitness one to survive, but the other mycelia are absorbed to disappear, so the population size recovers to the original size. After multiple iterations, the proposed algorithm can find the optimal solution to the flexible job shop scheduling problem. Third, a series of computational experiments are conducted on several benchmark instances, and a selection of mainstream algorithms is employed for comparison. These experiments revealed that the proposed method outperformed many state-of-the-art algorithms and is very promising in helping us to solve these complex problems.
Keywords
artificial Physarum polycephalum colony, flexible job shop scheduling, state transition diagram, swarm intelligence, transportation scheduling
Suggested Citation
Cai Z, Feng Y, Yang S, Yang J. A State Transition Diagram and an Artificial Physarum polycephalum Colony Algorithm for the Flexible Job Shop Scheduling Problem with Transportation Constraints. (2024). LAPSE:2024.0099
Author Affiliations
Cai Z: Hubei Province Engineering Technology Research Center for Construction Quality Testing Equipments, College of Computer and Information Technology, China Three Gorges University, Yichang 443002, China [ORCID]
Feng Y: Hubei Province Engineering Technology Research Center for Construction Quality Testing Equipments, College of Computer and Information Technology, China Three Gorges University, Yichang 443002, China
Yang S: Hubei Province Engineering Technology Research Center for Construction Quality Testing Equipments, College of Computer and Information Technology, China Three Gorges University, Yichang 443002, China
Yang J: Hubei Province Engineering Technology Research Center for Construction Quality Testing Equipments, College of Computer and Information Technology, China Three Gorges University, Yichang 443002, China
Journal Name
Processes
Volume
11
Issue
9
First Page
2646
Year
2023
Publication Date
2023-09-04
Published Version
ISSN
2227-9717
Version Comments
Original Submission
Other Meta
PII: pr11092646, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2024.0099
This Record
External Link

doi:10.3390/pr11092646
Publisher Version
Download
Files
[Download 1v1.pdf] (1.3 MB)
Jan 12, 2024
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
57
Version History
[v1] (Original Submission)
Jan 12, 2024
 
Verified by curator on
Jan 12, 2024
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2024.0099
 
Original Submitter
Calvin Tsay
Links to Related Works
Directly Related to This Work
Publisher Version