LAPSE:2023.7600
Published Article
LAPSE:2023.7600
Numerical Simulation Study on Temporary Well Shut-In Methods in the Development of Shale Oil Reservoirs
Qitao Zhang, Wenchao Liu, Jiaxin Wei, Arash Dahi Taleghani, Hai Sun, Daobing Wang
February 24, 2023
Abstract
Field tests indicate that temporary well shut-ins may enhance oil recovery from a shale reservoir; however, there is currently no systematic research to specifically guide such detailed operations in the field, especially for the design of the shut-in scheme and multiple rounds of shut-ins. In this study, the applicability of well shut-in operations for shale oil reservoirs is studied, and a numerical model is built using the finite element method. In order to simulate the production in a shale oil reservoir, two separate modules (i.e., Darcy’s law and phase transport) were two-way coupled together. The established model was validated by comparing its results with the analytical Buckley−Leverett equation. In this paper, the geological background and parameters of a shale oil reservoir in Chang-7 Member (Chenghao, China) were used for the analyses. The simulation results show that temporary well shut-in during production can significantly affect well performance. Implementing well shut-in could decrease the initial oil rate while decreasing the oil decline rate, which is conducive to long-term production. After continuous production for 1000 days, the oil rate with 120 days shut-in was 9.85% larger than the case with no shut-in. Besides, an optimal shut-in time has been identified as 60 days under our modeling conditions. In addition, the potential of several rounds of well shut-in operations was also tested in this study; it is recommended that one or two rounds of shut-ins be performed during development. When two rounds of shut-ins are implemented, it is recommended that the second round shut-in be performed after 300 days of production. In summary, this study reveals the feasibility of temporary well shut-in operations in the development of a shale oil reservoir and provides quantitative guidance to optimize these development scenarios.
Keywords
oil–water displacement, optimized shut-in scheme, shale oil reservoir, temporary shut-in, well performance
Suggested Citation
Zhang Q, Liu W, Wei J, Taleghani AD, Sun H, Wang D. Numerical Simulation Study on Temporary Well Shut-In Methods in the Development of Shale Oil Reservoirs. (2023). LAPSE:2023.7600
Author Affiliations
Zhang Q: School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China; John and Willie Leone Family Department of Energy and Mineral Engineering, The Pennsylvania State University, State College, PA 16801, USA
Liu W: School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China
Wei J: Geology Institute, No. 2 Oil Production Plant, Changqing Oilfield Company, Qingcheng, Qingyang 745100, China
Taleghani AD: John and Willie Leone Family Department of Energy and Mineral Engineering, The Pennsylvania State University, State College, PA 16801, USA
Sun H: School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China
Wang D: School of Mechanical Engineering, Beijing Institute of Petrochemical Technology, Beijing 102617, China
Journal Name
Energies
Volume
15
Issue
23
First Page
9161
Year
2022
Publication Date
2022-12-02
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en15239161, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.7600
This Record
External Link

https://doi.org/10.3390/en15239161
Publisher Version
Download
Files
Feb 24, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
201
Version History
[v1] (Original Submission)
Feb 24, 2023
 
Verified by curator on
Feb 24, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.7600
 
Record Owner
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version