LAPSE:2023.6423
Published Article
LAPSE:2023.6423
Numerical Simulation of Geothermal Reservoir Reconstruction and Heat Extraction System Productivity Evaluation
Jinshou Zhu, Zhenpeng Cui, Bo Feng, Hao Ren, Xin Liu
February 23, 2023
Abstract
The key to ensuring the economic feasibility of EGS mainly includes two points. On the one hand, it is necessary to ensure the connectivity of the artificial fracture network; on the other hand, it is necessary to determine the most efficient geothermal energy exploitation mode. Most previous studies have only focused on one of the points. To restitute the entire geothermal energy development process, the two parts should be combined to conduct research. In this study, a random fractured medium model was established based on the TOUGH2-BIOT simulation program and the whole process of reservoir stimulation was analyzed. According to the results of reservoir stimulation, different geothermal energy exploitation schemes are set up, and the heat transfer efficiency of the conventional double vertical wells, the horizontal wells, and the double-pipe heat exchange system are comparatively analyzed. The results show that reservoir reconstruction is mainly divided into three stages: In the first stage, the hydraulic aperture of the conducting fractures reaches the maximum value; in the second stage, the non-conductive fractures overcome the in situ stress and become conducting fractures; in the third stage, the rock in the reservoir undergoes shear failure, the fractures expand and connect, and finally, a fracture network is formed. After each stage, the volume of the enhanced permeability area is approximately 10,000, 21,000, and 33,000 m3, respectively. After 30 years of exploitation, the outlet temperature and thermal power output of conventional double vertical wells are the highest, while the horizontal wells have the highest heat extraction ratio. The temperature of a production well in the conventional double vertical wells model, horizontal wells, and double-pipe heat exchange system is 101 °C, 93.4 °C, and 91.6 °C, a decrease of 41.2%, 45.7%, and 46.7%, respectively. The thermal power output is 6.67 MW, 6.31 MW, and 6.1 MW, a decrease of 39.4%, 42.6%, and 44.5%, respectively. The heat extraction ratio of the horizontal wells is 2% higher than the double-pipe heat exchange system and 6.5% higher than the conventional double vertical wells.
Keywords
enhanced geothermal system, numerical simulation, productivity evaluation, reservoir reconstruction, TOUGH2-BIOT
Suggested Citation
Zhu J, Cui Z, Feng B, Ren H, Liu X. Numerical Simulation of Geothermal Reservoir Reconstruction and Heat Extraction System Productivity Evaluation. (2023). LAPSE:2023.6423
Author Affiliations
Zhu J: Qinghai Bureau of Geological Survey, Xining 810001, China
Cui Z: College of Environment and Resources, Jilin University, Changchun 130021, China
Feng B: College of Environment and Resources, Jilin University, Changchun 130021, China
Ren H: College of Environment and Resources, Jilin University, Changchun 130021, China
Liu X: College of Geosciences and Info-Physics, Central South University, Changsha 410083, China
Journal Name
Energies
Volume
16
Issue
1
First Page
127
Year
2022
Publication Date
2022-12-22
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en16010127, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.6423
This Record
External Link

https://doi.org/10.3390/en16010127
Publisher Version
Download
Files
Feb 23, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
197
Version History
[v1] (Original Submission)
Feb 23, 2023
 
Verified by curator on
Feb 23, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.6423
 
Record Owner
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version