LAPSE:2023.36617
Published Article
LAPSE:2023.36617
A Two-Stage Optimal Preventive Control Model Incorporating Transient Stability Constraints in the Presence of Multi-Resource Uncertainties
Qiulong Ni, Jingliao Sun, Xianyu Zha, Taibin Zhou, Zelun Sun, Ming Zhao
September 20, 2023
The volatility and uncertainty introduced by increasingly integrated renewable energy pose challenges to the reliable and stable operation of the power system. To mitigate the operation risks, a two-stage optimal preventive control model that incorporates transient stability constraints and considers uncertainties from multiple resources is proposed. First, the uncertainties of different re-sources are modeled, with which the non-sequential Monte Carlo sampling method is used to correspondingly generate the scenarios. Thereafter, a two-stage control model that balances operational safety and economy and realizes preventive control and emergency control is built. The operation schedule from the preventive control stage aims to minimize the transient stability probability and operation costs. If any faults destabilize the system, the emergency control stage will be activated immediately to help the system recover stability with minimal control costs. To expedite the solving of the two-stage model, a multi-objective particle swarm algorithm based on entropy-TOPSIS is proposed. Finally, the effectiveness of the proposed model and solving algorithm are validated with the modified IEEE118 node system.
Keywords
multi-resource uncertainties, particle swarm algorithm, preventive control, transient stability constraints, two-stage model
Suggested Citation
Ni Q, Sun J, Zha X, Zhou T, Sun Z, Zhao M. A Two-Stage Optimal Preventive Control Model Incorporating Transient Stability Constraints in the Presence of Multi-Resource Uncertainties. (2023). LAPSE:2023.36617
Author Affiliations
Ni Q: State Grid Zhejiang Electric Power Co., Ltd., Hangzhou 310000, China
Sun J: State Grid Wenzhou Electric Power Supply Company, Wenzhou 325000, China
Zha X: NARI Group Corporation (State Grid Electric Power Research Institute), Nanjing 210000, China
Zhou T: State Grid Wenzhou Electric Power Supply Company, Wenzhou 325000, China
Sun Z: NARI Group Corporation (State Grid Electric Power Research Institute), Nanjing 210000, China
Zhao M: NARI Group Corporation (State Grid Electric Power Research Institute), Nanjing 210000, China
Journal Name
Processes
Volume
11
Issue
8
First Page
2258
Year
2023
Publication Date
2023-07-26
Published Version
ISSN
2227-9717
Version Comments
Original Submission
Other Meta
PII: pr11082258, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.36617
This Record
External Link

doi:10.3390/pr11082258
Publisher Version
Download
Files
[Download 1v1.pdf] (4.2 MB)
Sep 20, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
73
Version History
[v1] (Original Submission)
Sep 20, 2023
 
Verified by curator on
Sep 20, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.36617
 
Original Submitter
Calvin Tsay
Links to Related Works
Directly Related to This Work
Publisher Version