Planning of Aegean Archipelago Interconnections to the Continental Power System of Greece
Michalis E. Karystianos, Charalampos N. Pitas, Stamatina P. Efstathiou, Marina A. Tsili, John C. Mantzaris, Eirini A. Leonidaki, Emmanouil M. Voumvoulakis, Nikos G. Sakellaridis
April 21, 2023
This paper presents the results of a thorough planning investigation carried out by the Transmission System Operator (TSO) and the Distribution Network Operator (DNO) in Greece in order to study the interconnections of the Aegean Islands with the mainland power system. The feasibility of interconnecting islands is based on the need for a reliable power supply to isolated and autonomous islands, reducing the operating costs of the power generation system through the withdrawal of high-cost oil-fired generating units, and the further ability to increase renewable energy source (RES) penetration in the country’s energy mix, according to directions imposed by the National Energy and Climate Plan. Among the alternative topologies and interconnection technologies considered, the final selection of the interconnection scheme selected for inclusion in the development plans of TSO and DNO was based on their detailed comparative evaluation, considering financial and other technical criteria.
Keywords
economic assessment, energy simulation, island interconnections, security analysis, transmission planning
Suggested Citation
Karystianos ME, Pitas CN, Efstathiou SP, Tsili MA, Mantzaris JC, Leonidaki EA, Voumvoulakis EM, Sakellaridis NG. Planning of Aegean Archipelago Interconnections to the Continental Power System of Greece. (2023). LAPSE:2023.33250
Author Affiliations
Karystianos ME: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Pitas CN: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece [ORCID]
Efstathiou SP: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Tsili MA: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Mantzaris JC: Independent Power Transmission Operator (IPTO-ADMIE), 89 Dyrrachiou Str., 104 43 Athens, Greece
Leonidaki EA: Hellenic Electricity Distribution Network Operator (HEDNO-DEDDIE), 24 Syngrou Av., 117 42 Athens, Greece
Voumvoulakis EM: Hellenic Electricity Distribution Network Operator (HEDNO-DEDDIE), 24 Syngrou Av., 117 42 Athens, Greece
Sakellaridis NG: Hellenic Electricity Distribution Network Operator (HEDNO-DEDDIE), 24 Syngrou Av., 117 42 Athens, Greece
Journal Name
Energies
Volume
14
Issue
13
First Page
3818
Year
2021
Publication Date
2021-06-24
Published Version
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14133818, Publication Type: Case Reports
Record Map
Published Article

LAPSE:2023.33250
This Record
External Link

doi:10.3390/en14133818
Publisher Version
Download
Files
[Download 1v1.pdf] (2.2 MB)
Apr 21, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
79
Version History
[v1] (Original Submission)
Apr 21, 2023
 
Verified by curator on
Apr 21, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.33250
 
Original Submitter
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version