Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process
April 20, 2023
Abstract
We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study being requested by a hydropower stakeholder or regulator, and ends with the study either being rejected or approved/conducted. Our two datasets consisted of summaries of information taken from (1), study determination letters prepared by FERC for 23 projects that were using the integrated licensing process, and (2), environmental study submittals and issuances tracked and attributed to seven projects using the FERC record. Our objective was to use the two resulting environmental life cycle datasets to understand which types of environmental studies are approved, rejected, and implemented during FERC licensing, and how consistently those types of studies are required across multiple hydropower projects. We matched the requested studies to a set of 61 river function indicators in eight categories and found that studies related to the category of biota and biodiversity were requested most often across all 29 projects. Within that category, studies related to river function indicators of presence, absence, detection of species and habitat/critical habitat were the most important to stakeholders, based on the relative number of studies requested. The study approval, rejection, and request rates were similar within each dataset, although the 23 projects with study determination letters had many rejected studies, whereas the dataset created from the seven projects had very few rejected studies.
Keywords
environmental impact, hydropower, hydropower regulation
Suggested Citation
Aldrovandi MSP, Parish ES, Pracheil BM. Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process. (2023). LAPSE:2023.32879
Author Affiliations
Aldrovandi MSP: Environmental Sciences Division, Oak Ridge National Laboratory, Oak Ridge, TN 37830, USA [ORCID]
Parish ES: Environmental Sciences Division, Oak Ridge National Laboratory, Oak Ridge, TN 37830, USA [ORCID]
Pracheil BM: Environmental Sciences Division, Oak Ridge National Laboratory, Oak Ridge, TN 37830, USA
Journal Name
Energies
Volume
14
Issue
12
First Page
3435
Year
2021
Publication Date
2021-06-10
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14123435, Publication Type: Review
Record Map
Published Article

LAPSE:2023.32879
This Record
External Link

https://doi.org/10.3390/en14123435
Publisher Version
Download
Files
Apr 20, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
175
Version History
[v1] (Original Submission)
Apr 20, 2023
 
Verified by curator on
Apr 20, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.32879
 
Record Owner
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version