Renewable Energy Auction Prices: Near Subsidy-Free?
March 27, 2023
Abstract
The latest trend of low record bid prices in renewable energy auctions has raised concerns on the effective deployment of the winning projects. A survey of recent auction data from several countries, technologies and remuneration designs is analysed and compared with the corresponding levelised costs of energy (LCOEs) to draw first insights on their viability. A critical assessment of the ability of the LCOE for determining the adequate bid level is then performed and the preliminary unviable results of selected mature technologies are further investigated using improved profitability metrics as the project and equity net present value (NPV) and internal rate of return (IRR). As representative examples, the analysed Danish 2019 onshore wind and photovoltaics (PV) auctions require very specific scenarios to become viable, which cast doubts on their effective implementation. Under the assumptions of a realistic base case, the sensitivity analysis revealed that either 59% of decrease in the weighted average cost of capital (WACC), or 37% of discount on the investment cost or a 3.6% annual increment in the mean market price is needed for achieving the NPV break-even in the onshore wind case. Likewise, the PV case is unprofitable whatever the WACC may be, and either a 60% discount on the investment cost or a 6.8% annual increment in the mean market price is needed for the NPV to break-even. Although some projects could be relying on indirect revenues or additional sources of incomes beyond the auction support, it remains to see if they are finally materialised.
The latest trend of low record bid prices in renewable energy auctions has raised concerns on the effective deployment of the winning projects. A survey of recent auction data from several countries, technologies and remuneration designs is analysed and compared with the corresponding levelised costs of energy (LCOEs) to draw first insights on their viability. A critical assessment of the ability of the LCOE for determining the adequate bid level is then performed and the preliminary unviable results of selected mature technologies are further investigated using improved profitability metrics as the project and equity net present value (NPV) and internal rate of return (IRR). As representative examples, the analysed Danish 2019 onshore wind and photovoltaics (PV) auctions require very specific scenarios to become viable, which cast doubts on their effective implementation. Under the assumptions of a realistic base case, the sensitivity analysis revealed that either 59% of decrease in the weighted average cost of capital (WACC), or 37% of discount on the investment cost or a 3.6% annual increment in the mean market price is needed for achieving the NPV break-even in the onshore wind case. Likewise, the PV case is unprofitable whatever the WACC may be, and either a 60% discount on the investment cost or a 6.8% annual increment in the mean market price is needed for the NPV to break-even. Although some projects could be relying on indirect revenues or additional sources of incomes beyond the auction support, it remains to see if they are finally materialised.
Record ID
Keywords
auctions, energy policy, LCOE, profitability, Renewable and Sustainable Energy, subsidy-free, tenders, valuation, zero-subsidy
Subject
Suggested Citation
Martín H, Coronas S, Alonso À, de la Hoz J, Matas J. Renewable Energy Auction Prices: Near Subsidy-Free?. (2023). LAPSE:2023.23987
Author Affiliations
Martín H: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain [ORCID]
Coronas S: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain [ORCID]
Alonso À: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain
de la Hoz J: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain
Matas J: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain [ORCID]
Coronas S: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain [ORCID]
Alonso À: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain
de la Hoz J: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain
Matas J: Electrical Engineering Department, Escola d′Enginyeria de Barcelona Est, Polytechnic University of Catalonia, 08930 Sant Adrià de Besòs, Barcelona, Spain [ORCID]
Journal Name
Energies
Volume
13
Issue
13
Article Number
E3383
Year
2020
Publication Date
2020-07-01
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en13133383, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.23987
This Record
External Link

https://doi.org/10.3390/en13133383
Publisher Version
Download
Meta
Record Statistics
Record Views
241
Version History
[v1] (Original Submission)
Mar 27, 2023
Verified by curator on
Mar 27, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.23987
Record Owner
Auto Uploader for LAPSE
Links to Related Works