LAPSE:2023.2375
Published Article
LAPSE:2023.2375
Numerical Investigation on the Impact of Tailings Slurry on Catch Dams Built at the Downstream of a Breached Tailings Pond
February 21, 2023
Abstract
Tailings storage facilities (TSFs) are known as a time-bomb. The numerous failures of TSFs and the heavy catastrophic consequences associated with each failure of TSFs indicate that preventing measures are necessary for existing TSFs. One of the preventing measures is to construct catch dams along the downstream near TSFs. The design of catch dams requires a good understanding of the dynamic interaction between the tailings slurry flow and the catch dams. There are, however, very few studies on this aspect. In this study, a numerical code, named LS-DYNA, that is based on a combination of smoothed particle hydrodynamics and a finite element method, was used. The numerical modeling shows that the tailings slurry flow can generally be divided into four stages. In terms of stability analysis, a catch dam should be built either very close to or very far from the TSF. When the catch dam with an upstream slope of a very small inclination angle is too close to the tailings pond, it can be necessary to build a very high catch dam or a secondary catch dam. As the impacting force can increase and decrease with the fluctuations back-and-forth of the tailings slurry flow, the ideal inclination angle of the upstream slope of the catch dam is between 30° and 37.5°, while the construction of a catch dam with a vertical upstream slope should be avoided. However, a catch dam with steeper upstream slopes seems to be more efficient in intercepting tailings flow and allowing the people downstream to have more time for evacuation. All these aspects need to be considered to optimize the design of catch dams.
Keywords
impacting force, kinetic energy, numerical simulation, smoothed particle hydrodynamics (SPH), tailings dam
Suggested Citation
Zhou S, Li L. Numerical Investigation on the Impact of Tailings Slurry on Catch Dams Built at the Downstream of a Breached Tailings Pond. (2023). LAPSE:2023.2375
Author Affiliations
Zhou S: School of Resources and Safety Engineering, Central South University, No.932 South Lushan Road, Changsha 410083, China; Research Institute on Mines and Environment, Department of Civil, Geological and Mining Engineering, École Polytechnique de Montréal, [ORCID]
Li L: Research Institute on Mines and Environment, Department of Civil, Geological and Mining Engineering, École Polytechnique de Montréal, C.P. 6079 Succursale Centre-Ville, Montréal, QC H3C 3A7, Canada [ORCID]
Journal Name
Processes
Volume
10
Issue
5
First Page
898
Year
2022
Publication Date
2022-05-02
ISSN
2227-9717
Version Comments
Original Submission
Other Meta
PII: pr10050898, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.2375
This Record
External Link

https://doi.org/10.3390/pr10050898
Publisher Version
Download
Files
Feb 21, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
238
Version History
[v1] (Original Submission)
Feb 21, 2023
 
Verified by curator on
Feb 21, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.2375
 
Record Owner
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version