CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts
March 7, 2023
Abstract
Brattice walls in mine shafts are used for various purposes, for example, permanent brattice walls can be used to separate ventilation sections. They can be also used in the case of modernization of the hoisting system, as it is in Shaft no. 1 of the Szczygłowice department, part of the Knurów-Szczyłowice coal mine. To shorten the time and reduce costs of the hoist modernization, the shaft is to be partitioned into two sections—with the hoist operating in one of them and another one being modernized in the other section. The new construction of the light brattice wall was designed for this purpose. To prove its usefulness and safety it was tested in the laboratory and computer simulations. The following paper presents CFD simulations of the brattice—its methodology and results together with an overview of works to be conducted in the shaft.
Brattice walls in mine shafts are used for various purposes, for example, permanent brattice walls can be used to separate ventilation sections. They can be also used in the case of modernization of the hoisting system, as it is in Shaft no. 1 of the Szczygłowice department, part of the Knurów-Szczyłowice coal mine. To shorten the time and reduce costs of the hoist modernization, the shaft is to be partitioned into two sections—with the hoist operating in one of them and another one being modernized in the other section. The new construction of the light brattice wall was designed for this purpose. To prove its usefulness and safety it was tested in the laboratory and computer simulations. The following paper presents CFD simulations of the brattice—its methodology and results together with an overview of works to be conducted in the shaft.
Record ID
Keywords
brattice wall, composites for mining industry, hoisting system modernization, mine shaft
Subject
Suggested Citation
Rokita T, Kamiński P, Ruta H, Szkudlarek Z. CFD Simulations of the New Construction of Light Brattice Wall for Mine Shafts. (2023). LAPSE:2023.18217
Author Affiliations
Rokita T: Department of Machinery Engineering and Transport, Faculty of Mechanical Engineering and Robotics, AGH University of Science and Technology, Adama Mickiewicza Ave. 30, 30-059 Krakow, Poland
Kamiński P: Department of Mining Engineering, Faculty of Civil Engineering and Resource Management, AGH University of Science and Technology, 30-059 Krakow, Poland [ORCID]
Ruta H: Department of Machinery Engineering and Transport, Faculty of Mechanical Engineering and Robotics, AGH University of Science and Technology, Adama Mickiewicza Ave. 30, 30-059 Krakow, Poland
Szkudlarek Z: Division of Machines and Equipment, KOMAG Institute of Mining Technology, 44-101 Gliwice, Poland [ORCID]
Kamiński P: Department of Mining Engineering, Faculty of Civil Engineering and Resource Management, AGH University of Science and Technology, 30-059 Krakow, Poland [ORCID]
Ruta H: Department of Machinery Engineering and Transport, Faculty of Mechanical Engineering and Robotics, AGH University of Science and Technology, Adama Mickiewicza Ave. 30, 30-059 Krakow, Poland
Szkudlarek Z: Division of Machines and Equipment, KOMAG Institute of Mining Technology, 44-101 Gliwice, Poland [ORCID]
Journal Name
Energies
Volume
14
Issue
21
First Page
7239
Year
2021
Publication Date
2021-11-03
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14217239, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.18217
This Record
External Link

https://doi.org/10.3390/en14217239
Publisher Version
Download
Meta
Record Statistics
Record Views
160
Version History
[v1] (Original Submission)
Mar 7, 2023
Verified by curator on
Mar 7, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.18217
Record Owner
Auto Uploader for LAPSE
Links to Related Works
[0.45 s]