This research aims to maximize the resilience of an electrical power system after an N−1 contingency, and this objective is achieved by switching the transmission lines connection using a heuristic that integrates optimal dc power flows (DCOPF), optimal transmission switching (OTS) and contingencies analysis. This paper’s methodology proposes to identify the order of re-entry of the elements that go out of the operation of an electrical power system after a contingency, for which DCOPF is used to determine the operating conditions accompanied by OTS that seeks to identify the maximum number of lines that can be disconnected seeking the most negligible impact on the contingency index J. The model allows each possible line-switching scenario to be analyzed and the one with the lowest value of J is chosen as the option to reconnect, this process is repeated until the entire power system is fully operational. As study cases, the IEEE 14, 30 and 39 bus bars were selected, in which the proposed methodology was applied and when the OTS was executed, the systems improved after the contingency; furthermore, when an adequate connection order of the disconnected lines is determined, the systems are significantly improved, therefore, the resilience of power systems is maximized, guaranteeing stable, reliable and safe behavior within operating parameters.
This research aims to maximize the resilience of an electrical power system after an N−1 contingency, and this objective is achieved by switching the transmission lines connection using a heuristic that integrates optimal dc power flows (DCOPF), optimal transmission switching (OTS) and contingencies analysis. This paper’s methodology proposes to identify the order of re-entry of the elements that go out of the operation of an electrical power system after a contingency, for which DCOPF is used to determine the operating conditions accompanied by OTS that seeks to identify the maximum number of lines that can be disconnected seeking the most negligible impact on the contingency index J. The model allows each possible line-switching scenario to be analyzed and the one with the lowest value of J is chosen as the option to reconnect, this process is repeated until the entire power system is fully operational. As study cases, the IEEE 14, 30 and 39 bus bars were selected, in which the proposed methodology was applied and when the OTS was executed, the systems improved after the contingency; furthermore, when an adequate connection order of the disconnected lines is determined, the systems are significantly improved, therefore, the resilience of power systems is maximized, guaranteeing stable, reliable and safe behavior within operating parameters.
Record ID
Keywords
contingency analysis, DC optimal power flow, electrical power system, electrical power system restoration, resilience, transmission optimal commutation
Subject
Suggested Citation
Pilatásig J, Carrión D, Jaramillo M. Resilience Maximization in Electrical Power Systems through Switching of Power Transmission Lines. (2023). LAPSE:2023.8444
Author Affiliations
Journal Name
Energies
Volume
15
Issue
21
First Page
8138
Year
2022
Publication Date
2022-11-01
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en15218138, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.8444
This Record
External Link

https://doi.org/10.3390/en15218138
Publisher Version
Download
Meta
Record Statistics
Record Views
390
Version History
[v1] (Original Submission)
Feb 24, 2023
Verified by curator on
Feb 24, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.8444
Record Owner
Auto Uploader for LAPSE
Links to Related Works
(0.07 seconds)
[0.07 s]