Among the various renewable energy generation systems, the solar photovoltaic occupies a leading position today due to its simple structure. However, increasing the efficiency of solar photovoltaic systems is a highly researched topic. In this study, possible connection failures in maximum power inverters and other failures, which decrease the efficiency in solar power plants, are examined. Furthermore, the possible consequences of these losses and their effects on the performance of solar power plants are explained. Some missing-failure processes were identified and corrected in the field analysis of the solar power plant in Turkey. Detected missing failures include connection failures of solar inverters, incorrect network configuration of camera system, fixing lighting time settings. The inverter string connection failure made during the projecting and assembly phase was eliminated and the maximum output was determined as 584.25 kW after the DC string arrangement. An increase of approximately 10% was achieved in production. In the project and application phase, the connection details of the inverters should be drawn and given to the field application personnel as a full-fledged project. In this way, incorrect connections that are not shown in the project and made in the field are prevented. This ensures that the installed power plant operates more efficiently, and the budgetary payback period of the investments made is shortened.
Among the various renewable energy generation systems, the solar photovoltaic occupies a leading position today due to its simple structure. However, increasing the efficiency of solar photovoltaic systems is a highly researched topic. In this study, possible connection failures in maximum power inverters and other failures, which decrease the efficiency in solar power plants, are examined. Furthermore, the possible consequences of these losses and their effects on the performance of solar power plants are explained. Some missing-failure processes were identified and corrected in the field analysis of the solar power plant in Turkey. Detected missing failures include connection failures of solar inverters, incorrect network configuration of camera system, fixing lighting time settings. The inverter string connection failure made during the projecting and assembly phase was eliminated and the maximum output was determined as 584.25 kW after the DC string arrangement. An increase of approximately 10% was achieved in production. In the project and application phase, the connection details of the inverters should be drawn and given to the field application personnel as a full-fledged project. In this way, incorrect connections that are not shown in the project and made in the field are prevented. This ensures that the installed power plant operates more efficiently, and the budgetary payback period of the investments made is shortened.
Record ID
Keywords
efficient production, inverter, solar power plant, string connection
Subject
Suggested Citation
Bakır H, Merabet A. Evaluation and Solution Suggestions for Engineering and Workmanship Failures during Design and Installation of Solar Power Plants. (2023). LAPSE:2023.3710
Author Affiliations
Journal Name
Energies
Volume
16
Issue
3
First Page
1457
Year
2023
Publication Date
2023-02-01
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en16031457, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.3710
This Record
External Link

https://doi.org/10.3390/en16031457
Publisher Version
Download
Meta
Record Statistics
Record Views
329
Version History
[v1] (Original Submission)
Feb 22, 2023
Verified by curator on
Feb 22, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.3710
Record Owner
Auto Uploader for LAPSE
Links to Related Works
(0.08 seconds)
[0.09 s]