Delay Causes and Types in Nigerian Power Construction Projects
Usman Ismaila, Wooyong Jung, Chan Young Park
April 19, 2023
Numerous events cause delays to entire power projects’ completion timelines, leading to loss. This paper focuses on revealing the critical delay causes in Nigerian power projects and identifying the delay types such as excusable delay, compensable delay, critical delay, and concurrent delay from the different perspectives of owner and contractor. Based on the survey of the 84 industrial experts in power distribution and transmission projects in Nigeria, this study provides the mean score and rank of 39 delay causes. Among the causes, 14 are identified as critical in the Nigerian power project. The top three critical delay causes are corruption and bureaucracy in government, inadequate fund/budget allocation, and price fluctuation/inflation. Owner and contractor do not show the difference in classifying the 14 delay causes into excusable and compensable delays. However, there was a difference between owner and contractor in categorizing whether a cause is critical or not and concurrent or not. A different viewpoint of types of delay cause can lead to a dispute which may lead to other delays and losses, and thus it is meaningful to understand the types of delay perceived from owner and contractor. Even though the delay cause and types are different depending on an individual project, the results of this study serve as a reference and would be beneficial for the practitioners in the construction industry to help identify the delay causes to manage them effectively.
Keywords
compensable delay, concurrent delay, critical delay, delay cause, delay types, excusable delay
Suggested Citation
Ismaila U, Jung W, Park CY. Delay Causes and Types in Nigerian Power Construction Projects. (2023). LAPSE:2023.31484
Author Affiliations
Ismaila U: Department of Nuclear Power Plant Engineering, KEPCO International Nuclear Graduate School, Ulsan 45014, Korea
Jung W: Department of Nuclear Power Plant Engineering, KEPCO International Nuclear Graduate School, Ulsan 45014, Korea
Park CY: Intelligent Construction Automation Center, Kyungpook National University, Daegu 41566, Korea
Journal Name
Energies
Volume
15
Issue
3
First Page
814
Year
2022
Publication Date
2022-01-23
Published Version
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en15030814, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.31484
This Record
External Link

doi:10.3390/en15030814
Publisher Version
Download
Files
[Download 1v1.pdf] (474 kB)
Apr 19, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
67
Version History
[v1] (Original Submission)
Apr 19, 2023
 
Verified by curator on
Apr 19, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.31484
 
Original Submitter
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version