LAPSE:2023.28980
Published Article
LAPSE:2023.28980
Generation of Hydro Energy by Using Data Mining Algorithm for Cascaded Hydropower Plant
Iram Parvez, Jianjian Shen, Ishitaq Hassan, Nannan Zhang
April 12, 2023
The thirst of the Earth for energy is lurching towards catastrophe in an era of increasing water shortage where most of the power plants are hydroelectric. The hydro-based power systems are facing challenges in determining day-ahead generation schedules of cascaded hydropower plants. The objective of the current study is to find a speedy and practical method for predicting and classifying the future schedules of hydropower plants in order to increase the overall efficiency of energy by utilizing the water of cascaded hydropower plants. This study is significant for water resource planners in the planning and management of reservoirs for generating energy. The proposed method consists of data mining techniques and approaches. The energy production relationship is first determined for upstream and downstream hydropower plants by using multiple linear regression. Then, a cluster analysis is used to find typical generation curves with the help of historical data. The decision tree algorithm C4.5, Iterative Dichotomiser 3-IV, improved C4.5 and Chi-Squared Automatic Interaction Detection are adopted to quickly predict generation schedules, and detailed comparison among different algorithms are made. The decision tree algorithms are solved using SIPINA software. Results show that the C4.5 algorithm is more feasible for rapidly generating the schedules of cascaded hydropower plants. This decision tree algorithm is helpful for the researchers to make fast decisions in order to enhance the energy production of cascaded hydropower plants. The major elements of this paper are challenges and solution of head sensitive hydropower plants, using the decision-making algorithms for producing the generation schedules, and comparing the generation from the proposed method with actual energy production.
Keywords
cascaded hydropower plants, data mining techniques, energy production, generation schedules, short-term scheduling
Suggested Citation
Parvez I, Shen J, Hassan I, Zhang N. Generation of Hydro Energy by Using Data Mining Algorithm for Cascaded Hydropower Plant. (2023). LAPSE:2023.28980
Author Affiliations
Parvez I: Institute of Hydropower and Hydro informatics, Dalian University of Technology, Dalian 116024, China
Shen J: Institute of Hydropower and Hydro informatics, Dalian University of Technology, Dalian 116024, China; Key Laboratory of Ocean Energy Utilization and Energy Conservation of Ministry of Education, Dalian 116024, China
Hassan I: Department of Civil Engineering, Capital University of Science and Technology, Islamabad 44000, Pakistan
Zhang N: Basin Projects Operation Management Department China three Gorges Limited Corporation, Yichang 443133, China
Journal Name
Energies
Volume
14
Issue
2
Article Number
en14020298
Year
2021
Publication Date
2021-01-07
Published Version
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14020298, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.28980
This Record
External Link

doi:10.3390/en14020298
Publisher Version
Download
Files
[Download 1v1.pdf] (5.9 MB)
Apr 12, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
56
Version History
[v1] (Original Submission)
Apr 12, 2023
 
Verified by curator on
Apr 12, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.28980
 
Original Submitter
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version