Abstract
We formulated a problem faced by a power producer who owns a combined-cycle gas turbine (CCGT) and desires to maximize its expected profit in a medium-term planning horizon. We assumed that this producer can participate in the spot and over-the-counter markets to buy and sell natural gas and electricity. We also considered that the power producer has gas storage available that can be used for handling the availability of gas and the uncertainty of gas prices. A stochastic programming model was used to formulate this problem, where the electricity and gas prices were characterized as stochastic processes using a set of scenarios. The proposed model includes the technical constraints resulting from the operation of the combined cycle power plant and the gas storage and a detailed description of the different markets in which the power producer can participate. Finally, the performance of the proposed model is tested in a realistic case study. The numerical results show that the usage of the gas storage unit allows the power producer to increase its expected profit. Additionally, it is observed that bilateral contracting decisions are not influenced by the presence of the gas storage unit.
We formulated a problem faced by a power producer who owns a combined-cycle gas turbine (CCGT) and desires to maximize its expected profit in a medium-term planning horizon. We assumed that this producer can participate in the spot and over-the-counter markets to buy and sell natural gas and electricity. We also considered that the power producer has gas storage available that can be used for handling the availability of gas and the uncertainty of gas prices. A stochastic programming model was used to formulate this problem, where the electricity and gas prices were characterized as stochastic processes using a set of scenarios. The proposed model includes the technical constraints resulting from the operation of the combined cycle power plant and the gas storage and a detailed description of the different markets in which the power producer can participate. Finally, the performance of the proposed model is tested in a realistic case study. The numerical results show that the usage of the gas storage unit allows the power producer to increase its expected profit. Additionally, it is observed that bilateral contracting decisions are not influenced by the presence of the gas storage unit.
Record ID
Keywords
combined-cycle gas turbine, electricity and natural gas markets, medium-term scheduling, natural gas storage, stochastic programming unit-commitment
Subject
Suggested Citation
Gómez-Villarreal H, Carrión M, Domínguez R. Optimal Management of Combined-Cycle Gas Units with Gas Storage under Uncertainty. (2023). LAPSE:2023.21376
Author Affiliations
Gómez-Villarreal H: Department of Electrical Engineering, University of Castilla—La Mancha, 45071 Toledo, Spain [ORCID]
Carrión M: Department of Electrical Engineering, University of Castilla—La Mancha, 45071 Toledo, Spain [ORCID]
Domínguez R: Department of Electrical Engineering, University of Castilla—La Mancha, 45071 Toledo, Spain [ORCID]
Carrión M: Department of Electrical Engineering, University of Castilla—La Mancha, 45071 Toledo, Spain [ORCID]
Domínguez R: Department of Electrical Engineering, University of Castilla—La Mancha, 45071 Toledo, Spain [ORCID]
Journal Name
Energies
Volume
13
Issue
1
Article Number
E113
Year
2019
Publication Date
2019-12-24
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en13010113, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.21376
This Record
External Link

https://doi.org/10.3390/en13010113
Publisher Version
Download
Meta
Record Statistics
Record Views
305
Version History
[v1] (Original Submission)
Mar 22, 2023
Verified by curator on
Mar 22, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.21376
Record Owner
Auto Uploader for LAPSE
Links to Related Works
(1.15 seconds) 0.15 + 0.07 + 0.48 + 0.14 + 0.01 + 0.06 + 0.06 + 0 + 0.06 + 0.13 + 0 + 0