Power transmission (PT) projects are vital for the power sector. However, worldwide PT projects experience delay. There is an urgent need to understand the unique causes of delays in PT projects. This paper presents the first empirical study on causes of delays in PT projects via a comprehensive literature review. Based on this literature review, 63 potential delay factors are identified and divided into ten major groups. These include two new groups of delay attributes, comprising sector-specific factors (SSF) and general factors (GF), where SSF pertains solely to PT projects and GF contributes to minimizing the bias of project participants. A questionnaire survey of 311 PT stakeholders is conducted to determine the overall ranking of the delay factors using the relative importance index. The results indicate that SSF, GF, and external/unavoidable factors are the most critical groups of delay factors, with the top-ranked factors being right of way problems of transmission line (TL), frequent changes in TL routes, and accessibility to the TL tower locations. Finally, recommendations are made to help minimize time overruns in PT projects, as well as in other linear power and non-power construction projects in general.
Power transmission (PT) projects are vital for the power sector. However, worldwide PT projects experience delay. There is an urgent need to understand the unique causes of delays in PT projects. This paper presents the first empirical study on causes of delays in PT projects via a comprehensive literature review. Based on this literature review, 63 potential delay factors are identified and divided into ten major groups. These include two new groups of delay attributes, comprising sector-specific factors (SSF) and general factors (GF), where SSF pertains solely to PT projects and GF contributes to minimizing the bias of project participants. A questionnaire survey of 311 PT stakeholders is conducted to determine the overall ranking of the delay factors using the relative importance index. The results indicate that SSF, GF, and external/unavoidable factors are the most critical groups of delay factors, with the top-ranked factors being right of way problems of transmission line (TL), frequent changes in TL routes, and accessibility to the TL tower locations. Finally, recommendations are made to help minimize time overruns in PT projects, as well as in other linear power and non-power construction projects in general.
Record ID
Keywords
power projects, power transmission projects, project delay, schedule delay
Subject
Suggested Citation
Pall GK, Bridge AJ, Gray J, Skitmore M. Causes of Delay in Power Transmission Projects: An Empirical Study. (2023). LAPSE:2023.21285
Author Affiliations
Pall GK: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia [ORCID]
Bridge AJ: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia
Gray J: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia
Skitmore M: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia
Bridge AJ: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia
Gray J: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia
Skitmore M: School of Civil Engineering and Built Environment, Queensland University of Technology (QUT), 2 George Street, Brisbane, QLD 4001, Australia
Journal Name
Energies
Volume
13
Issue
1
Article Number
E17
Year
2019
Publication Date
2019-12-19
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en13010017, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.21285
This Record
External Link

https://doi.org/10.3390/en13010017
Publisher Version
Download
Meta
Record Statistics
Record Views
185
Version History
[v1] (Original Submission)
Mar 22, 2023
Verified by curator on
Mar 22, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.21285
Record Owner
Auto Uploader for LAPSE
Links to Related Works