LAPSE:2023.20110
Published Article

LAPSE:2023.20110
Efficiency Comparison of DC and AC Coupling Solutions for Large-Scale PV+BESS Power Plants
March 10, 2023
Abstract
In large-scale photovoltaic (PV) power plants, the integration of a battery energy storage system (BESS) permits a more flexible operation, allowing the plant to support grid stability. In hybrid PV+BESS plants, the storage system can be integrated by using different power conversion system (PCS) layouts and different charge−discharge strategies. In the AC-coupling layout, the BESS is connected to the ac-side of the system through an additional inverter. In the DC-coupling layout, the BESS is connected to the dc-side, with or without a dedicated dc−dc converter, and no additional inverter is needed. Referring to a 288 MWp PV plant with a 275 MWh BESS, this paper compares the PCS efficiency between AC- and DC-coupling solutions. The power injected into the grid is obtained considering providing primary power-frequency regulation services. A charging and discharging strategy of the BESS is proposed to ensure cyclic battery energy shifting. The power flows in the different components of the system that are obtained under realistic operating conditions, and total energy losses and annual average efficiency are calculated accordingly. Finally, results show a higher efficiency of DC-coupling compared to the AC-coupling layout.
In large-scale photovoltaic (PV) power plants, the integration of a battery energy storage system (BESS) permits a more flexible operation, allowing the plant to support grid stability. In hybrid PV+BESS plants, the storage system can be integrated by using different power conversion system (PCS) layouts and different charge−discharge strategies. In the AC-coupling layout, the BESS is connected to the ac-side of the system through an additional inverter. In the DC-coupling layout, the BESS is connected to the dc-side, with or without a dedicated dc−dc converter, and no additional inverter is needed. Referring to a 288 MWp PV plant with a 275 MWh BESS, this paper compares the PCS efficiency between AC- and DC-coupling solutions. The power injected into the grid is obtained considering providing primary power-frequency regulation services. A charging and discharging strategy of the BESS is proposed to ensure cyclic battery energy shifting. The power flows in the different components of the system that are obtained under realistic operating conditions, and total energy losses and annual average efficiency are calculated accordingly. Finally, results show a higher efficiency of DC-coupling compared to the AC-coupling layout.
Record ID
Keywords
battery energy storage system (BESS), grid-connected PV plant, photovoltaic, power conversion system (PCS), renewable energy sources (RES), solar plus storage sizing
Subject
Suggested Citation
Lo Franco F, Morandi A, Raboni P, Grandi G. Efficiency Comparison of DC and AC Coupling Solutions for Large-Scale PV+BESS Power Plants. (2023). LAPSE:2023.20110
Author Affiliations
Lo Franco F: Department of Electrical, Electronic and Information Engineering, University of Bologna, 40136 Bologna, Italy [ORCID]
Morandi A: Department of Electrical, Electronic and Information Engineering, University of Bologna, 40136 Bologna, Italy
Raboni P: NHOA, 20158 Milano, Italy [ORCID]
Grandi G: Department of Electrical, Electronic and Information Engineering, University of Bologna, 40136 Bologna, Italy [ORCID]
Morandi A: Department of Electrical, Electronic and Information Engineering, University of Bologna, 40136 Bologna, Italy
Raboni P: NHOA, 20158 Milano, Italy [ORCID]
Grandi G: Department of Electrical, Electronic and Information Engineering, University of Bologna, 40136 Bologna, Italy [ORCID]
Journal Name
Energies
Volume
14
Issue
16
First Page
4823
Year
2021
Publication Date
2021-08-07
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14164823, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.20110
This Record
External Link

https://doi.org/10.3390/en14164823
Publisher Version
Download
Meta
Record Statistics
Record Views
298
Version History
[v1] (Original Submission)
Mar 10, 2023
Verified by curator on
Mar 10, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.20110
Record Owner
Auto Uploader for LAPSE
Links to Related Works
(0.07 seconds)
[0.08 s]
