Strategies to Increase the Transient Active Power of Photovoltaic Units during Low Voltage Ride Through
March 9, 2023
Abstract
Due to a limitation in the magnitude of the three-phase output inverter currents, the output active power of the photovoltaic (PV) unit has been de-rated during low voltage ride through, which brings great instability risk to the power system. With the increase in the penetration rate of new energy, the impact of the power shortage on the system transient stability increases. It is of great significance to analyze the impact of this transient power shortage on system stability. This article explores methods to improve the active power output capability of photovoltaic units during low-breakthrough periods. A transient simulation model of a grid-connected PV generator with low-voltage ride-through (LVRT) capability is presented, under the condition of meeting the overcurrent capacity of the PV inverter and the requirement of dynamic reactive power support supplied by the PV generator specified in the China grid codes (GB/T 19964-2012) during grid fault. An example system with high PV penetration is built. The change principle and influencing factors of PV transient active power output are analyzed. The simulation model is designed in PowerFactory/DIgSILENT, and several types of three-phase voltage sags are performed in simulation to assess the impact of the active current reference calculation method and the maximum inverter output current (Imax) limit value on the PV active power output. According to the three indexes, namely the maximum active power of PV unit during the fault, the power improvement gradient and the power surge after the fault is cleared. Simulation results showed that using the orthogonal decomposition method to calculate the active current reference can make full use of the current capacity of the converter. Setting Imax to 1.1 rated current of photovoltaic inverter (IN) can reduce the cost-effectiveness ratio of the transient active power output of the PV unit. Therefore, we aim to improve the unit’s transient active power output capacity and realize the optimal effect of improving the transient active power shortage of the system.
Due to a limitation in the magnitude of the three-phase output inverter currents, the output active power of the photovoltaic (PV) unit has been de-rated during low voltage ride through, which brings great instability risk to the power system. With the increase in the penetration rate of new energy, the impact of the power shortage on the system transient stability increases. It is of great significance to analyze the impact of this transient power shortage on system stability. This article explores methods to improve the active power output capability of photovoltaic units during low-breakthrough periods. A transient simulation model of a grid-connected PV generator with low-voltage ride-through (LVRT) capability is presented, under the condition of meeting the overcurrent capacity of the PV inverter and the requirement of dynamic reactive power support supplied by the PV generator specified in the China grid codes (GB/T 19964-2012) during grid fault. An example system with high PV penetration is built. The change principle and influencing factors of PV transient active power output are analyzed. The simulation model is designed in PowerFactory/DIgSILENT, and several types of three-phase voltage sags are performed in simulation to assess the impact of the active current reference calculation method and the maximum inverter output current (Imax) limit value on the PV active power output. According to the three indexes, namely the maximum active power of PV unit during the fault, the power improvement gradient and the power surge after the fault is cleared. Simulation results showed that using the orthogonal decomposition method to calculate the active current reference can make full use of the current capacity of the converter. Setting Imax to 1.1 rated current of photovoltaic inverter (IN) can reduce the cost-effectiveness ratio of the transient active power output of the PV unit. Therefore, we aim to improve the unit’s transient active power output capacity and realize the optimal effect of improving the transient active power shortage of the system.
Record ID
Keywords
grid-connected photovoltaic system, low voltage ride through, transient active power, voltage sags
Subject
Suggested Citation
Yan X, Liang B, Jia J, Aslam W, Wang C, Zhang S, Ma H. Strategies to Increase the Transient Active Power of Photovoltaic Units during Low Voltage Ride Through. (2023). LAPSE:2023.19662
Author Affiliations
Yan X: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Liang B: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China [ORCID]
Jia J: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Aslam W: Department of Electrical Engineering, University of Sargodha, Sargodha 40100, Pakistan [ORCID]
Wang C: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Zhang S: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Ma H: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Liang B: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China [ORCID]
Jia J: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Aslam W: Department of Electrical Engineering, University of Sargodha, Sargodha 40100, Pakistan [ORCID]
Wang C: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Zhang S: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Ma H: Key Laboratory of Distributed Energy Storage, Micro-Grid of Hebei Province, North China Electric Power University, No.619 Yonghua Road, Baoding 071003, China
Journal Name
Energies
Volume
14
Issue
17
First Page
5236
Year
2021
Publication Date
2021-08-24
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14175236, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.19662
This Record
External Link

https://doi.org/10.3390/en14175236
Publisher Version
Download
Meta
Record Statistics
Record Views
124
Version History
[v1] (Original Submission)
Mar 9, 2023
Verified by curator on
Mar 9, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.19662
Record Owner
Auto Uploader for LAPSE
Links to Related Works
(0.66 seconds) 0.12 + 0.03 + 0.23 + 0.1 + 0 + 0.06 + 0.03 + 0 + 0.02 + 0.05 + 0 + 0.01