LAPSE:2023.18888
Published Article

LAPSE:2023.18888
Research on Machining Workshop Batch Scheduling Incorporating the Completion Time and Non-Processing Energy Consumption Considering Product Structure
March 9, 2023
Abstract
Energy-saving scheduling is a well-known issue in the manufacturing system. The flexibility of the workshop increases the difficulty of scheduling. In the workshop schedule, considering the collaborative optimization of multi-level structure product production and energy consumption has certain practical significance. The process sequence of parts and components should be consistent with the assembly sequence. Additionally, the non-production energy consumption (NPEC) (such as the energy consumption of workpiece handling, equipment standby, and workpiece conversion) generated by the auxiliary machining operations, which make up the majority of the total energy consumption, should not be ignored. A sub-batch priority is set according to the upper and lower coupling relationship in the product structure. A bi-objective batch scheduling model that minimizes the total energy consumption and the total completion time is developed, and the multi-objective gray wolf optimizer (MOGWO) is employed as the solution to obtain the optimal schedule scheme. A case study is performed to demonstrate the potential possibilities concerning NPEC in regard to reducing the total energy consumption and to show the effectiveness of the algorithm. Compared with the traditional optimization model, the joint optimization of NPEC and PEC can reduce the energy consumption of standby and handling by 9.95% and 22.28%, respectively.
Energy-saving scheduling is a well-known issue in the manufacturing system. The flexibility of the workshop increases the difficulty of scheduling. In the workshop schedule, considering the collaborative optimization of multi-level structure product production and energy consumption has certain practical significance. The process sequence of parts and components should be consistent with the assembly sequence. Additionally, the non-production energy consumption (NPEC) (such as the energy consumption of workpiece handling, equipment standby, and workpiece conversion) generated by the auxiliary machining operations, which make up the majority of the total energy consumption, should not be ignored. A sub-batch priority is set according to the upper and lower coupling relationship in the product structure. A bi-objective batch scheduling model that minimizes the total energy consumption and the total completion time is developed, and the multi-objective gray wolf optimizer (MOGWO) is employed as the solution to obtain the optimal schedule scheme. A case study is performed to demonstrate the potential possibilities concerning NPEC in regard to reducing the total energy consumption and to show the effectiveness of the algorithm. Compared with the traditional optimization model, the joint optimization of NPEC and PEC can reduce the energy consumption of standby and handling by 9.95% and 22.28%, respectively.
Record ID
Keywords
multi-level structure, multi-objective gray wolf optimizer (MOGWO), non-production energy consumption (NPEC), sub-batch priority
Subject
Suggested Citation
Li N, Feng C. Research on Machining Workshop Batch Scheduling Incorporating the Completion Time and Non-Processing Energy Consumption Considering Product Structure. (2023). LAPSE:2023.18888
Author Affiliations
Li N: Department of Industrial Engineering, School of Mines, China University of Mining and Technology, Xuzhou 221116, China
Feng C: Department of Industrial Engineering, School of Mines, China University of Mining and Technology, Xuzhou 221116, China
Feng C: Department of Industrial Engineering, School of Mines, China University of Mining and Technology, Xuzhou 221116, China
Journal Name
Energies
Volume
14
Issue
19
First Page
6079
Year
2021
Publication Date
2021-09-24
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14196079, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.18888
This Record
External Link

https://doi.org/10.3390/en14196079
Publisher Version
Download
Meta
Record Statistics
Record Views
181
Version History
[v1] (Original Submission)
Mar 9, 2023
Verified by curator on
Mar 9, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.18888
Record Owner
Auto Uploader for LAPSE
Links to Related Works
