Hydrogen Infrastructure Project Risks in The Netherlands
March 9, 2023
Abstract
This study aims to assess the potential risks of setting up a hydrogen infrastructure in the Netherlands. An integrated risk assessment framework, capable of analyzing projects, identifying risks and comparing projects, is used to identify and analyze the main risks in the upcoming Dutch hydrogen infrastructure project. A time multiplier is added to the framework to develop parameters. The impact of the different risk categories provided by the integrated framework is calculated using the discounted cash flow (DCF) model. Despite resource risks having the highest impact, scope risks are shown to be the most prominent in the hydrogen infrastructure project. To present the DCF model results, a risk assessment matrix is constructed. Compared to the conventional Risk Assessment Matrix (RAM) used to present project risks, this matrix presents additional information in terms of the internal rate of return and risk specifics.
This study aims to assess the potential risks of setting up a hydrogen infrastructure in the Netherlands. An integrated risk assessment framework, capable of analyzing projects, identifying risks and comparing projects, is used to identify and analyze the main risks in the upcoming Dutch hydrogen infrastructure project. A time multiplier is added to the framework to develop parameters. The impact of the different risk categories provided by the integrated framework is calculated using the discounted cash flow (DCF) model. Despite resource risks having the highest impact, scope risks are shown to be the most prominent in the hydrogen infrastructure project. To present the DCF model results, a risk assessment matrix is constructed. Compared to the conventional Risk Assessment Matrix (RAM) used to present project risks, this matrix presents additional information in terms of the internal rate of return and risk specifics.
Record ID
Keywords
discounted cash flow model, hydrogen infrastructure, project comparison, risk assessment matrix, risk identification
Subject
Suggested Citation
Vasbinder PWM, de Vries AWG, Westerman W. Hydrogen Infrastructure Project Risks in The Netherlands. (2023). LAPSE:2023.18816
Author Affiliations
Vasbinder PWM: Department of Economics, Econometrics and Finance, Faculty of Economics and Business, University of Groningen, Nettelbosje 2, 9747 AE Groningen, The Netherlands
de Vries AWG: N.V. Nederlandse Gasunie, Concourslaan 17, 9727 KC Groningen, The Netherlands
Westerman W: Department of Economics, Econometrics and Finance, Faculty of Economics and Business, University of Groningen, Nettelbosje 2, 9747 AE Groningen, The Netherlands [ORCID]
de Vries AWG: N.V. Nederlandse Gasunie, Concourslaan 17, 9727 KC Groningen, The Netherlands
Westerman W: Department of Economics, Econometrics and Finance, Faculty of Economics and Business, University of Groningen, Nettelbosje 2, 9747 AE Groningen, The Netherlands [ORCID]
Journal Name
Energies
Volume
14
Issue
19
First Page
6009
Year
2021
Publication Date
2021-09-22
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en14196009, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.18816
This Record
External Link

https://doi.org/10.3390/en14196009
Publisher Version
Download
Meta
Record Statistics
Record Views
247
Version History
[v1] (Original Submission)
Mar 9, 2023
Verified by curator on
Mar 9, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.18816
Record Owner
Auto Uploader for LAPSE
Links to Related Works