Pressure Drop Optimization of the Main Steam and Reheat Steam System of a 1000 MW Secondary Reheat Unit
March 1, 2023
Abstract
The pressure drop of a main steam and reheat steam system should be optimized during the design and operation of a thermal power plant to minimize operation costs. In this study, the pressure drop of the main steam pipe and reheat steam pipe of a 1000 MW secondary reheat unit are optimized by modulating the operation parameters and the cost of operation is explored. Optimal pipe specifications were achieved by selecting a bend pipe and optimizing the pipe specifications. The pressure loss of the main steam pipeline was optimized to 2.61% compared with the conventional pressure drop (5%), the heat consumption of steam turbine was reduced by about 0.63 kJ/(kW·h), the standard coal consumption was minimized by about 0.024 g/(kW·h), and the total income in 20 years is approximated to be CNY 217,700. The primary reheat system was optimized to 4.88%, the steam turbine heat consumption was reduced by about 7.13 kJ/(kW·h), the standard coal consumption decreased by about 0.276 g/(kW·h), and the total income in 20 years is projected to be CNY 20.872 million after the optimization of the pressure drop. The secondary reheat system was optimized to 8.13%, the steam turbine heat consumption was reduced by about 7.86 kJ/(kW·h), the standard coal consumption decreased by about 0.304 g/(kW·h), and the total income in 20 years is projected to be CNY 22.7232 million after the optimization of the pressure drop. The research results of the present study provide a guide for the design and operation of secondary reheat units to achieve an effective operation and minimize costs.
The pressure drop of a main steam and reheat steam system should be optimized during the design and operation of a thermal power plant to minimize operation costs. In this study, the pressure drop of the main steam pipe and reheat steam pipe of a 1000 MW secondary reheat unit are optimized by modulating the operation parameters and the cost of operation is explored. Optimal pipe specifications were achieved by selecting a bend pipe and optimizing the pipe specifications. The pressure loss of the main steam pipeline was optimized to 2.61% compared with the conventional pressure drop (5%), the heat consumption of steam turbine was reduced by about 0.63 kJ/(kW·h), the standard coal consumption was minimized by about 0.024 g/(kW·h), and the total income in 20 years is approximated to be CNY 217,700. The primary reheat system was optimized to 4.88%, the steam turbine heat consumption was reduced by about 7.13 kJ/(kW·h), the standard coal consumption decreased by about 0.276 g/(kW·h), and the total income in 20 years is projected to be CNY 20.872 million after the optimization of the pressure drop. The secondary reheat system was optimized to 8.13%, the steam turbine heat consumption was reduced by about 7.86 kJ/(kW·h), the standard coal consumption decreased by about 0.304 g/(kW·h), and the total income in 20 years is projected to be CNY 22.7232 million after the optimization of the pressure drop. The research results of the present study provide a guide for the design and operation of secondary reheat units to achieve an effective operation and minimize costs.
Record ID
Keywords
1000 MW secondary reheat unit, main steam and reheat steam system, pressure drop optimization
Subject
Suggested Citation
Li Y, Liu J, Huang G. Pressure Drop Optimization of the Main Steam and Reheat Steam System of a 1000 MW Secondary Reheat Unit. (2023). LAPSE:2023.13632
Author Affiliations
Li Y: MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, College of Environmental Science and Engineering, North China Electric Power University, Beijing 102206, China; State Key Joint Laboratory of Environmental Simulation and Pollut [ORCID]
Liu J: Shandong Electric Power Engineering Consulting Institute Corp., Ltd., Jinan 250013, China
Huang G: MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, College of Environmental Science and Engineering, North China Electric Power University, Beijing 102206, China
Liu J: Shandong Electric Power Engineering Consulting Institute Corp., Ltd., Jinan 250013, China
Huang G: MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, College of Environmental Science and Engineering, North China Electric Power University, Beijing 102206, China
Journal Name
Energies
Volume
15
Issue
9
First Page
3279
Year
2022
Publication Date
2022-04-29
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en15093279, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.13632
This Record
External Link

https://doi.org/10.3390/en15093279
Publisher Version
Download
Meta
Record Statistics
Record Views
189
Version History
[v1] (Original Submission)
Mar 1, 2023
Verified by curator on
Mar 1, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.13632
Record Owner
Auto Uploader for LAPSE
Links to Related Works