LAPSE:2023.0650
Published Article

LAPSE:2023.0650
Dynamic Risk Assessment of High Slope in Open-Pit Coalmines Based on Interval Trapezoidal Fuzzy Soft Set Method: A Case Study
February 20, 2023
Abstract
Effective high slope risk assessment plays an important role in the safety management and control of the open-pit coal mining process. Traditional slope stability risk assessment methods rarely consider the time factor or evaluate the dynamic change of high slope in an open-pit mine at a certain time in a sensitivity assessment. This paper develops an interval trapezoidal fuzzy soft set method to achieve the high slope dynamic risk evaluation. The proposed dynamic interval trapezoidal fuzzy soft set method for risk assessment of high slope in an open-pit coal mine is developed by integrating the time points and weights of slope risk factors. The extended interval trapezoidal fuzzy soft set was used to calculate the weights of risk factors at different times, and the Fuzzy Analytical Hierarchy Process (FAHP) method was applied to determine the weights of risk factors. The weight change of different risk factors with time can be easily achieved with the proposed method. As a case study, this approach is implemented into a risk assessment model for the north high slope in Shengli #1 open-pit mine located in Xilinhot, Inner Mongolia. The model complies with three time points and contains 4 primary risk factors (S) and 17 secondary risk factors. The results indicated that the hydrological climate conditions and slope geometry conditions were the high risk factors affecting this open-pit coal mine slope. The reasonability and effectiveness of the evaluation results were verified with in-situ observations and measurements. This dynamic risk assessment method is helpful for improving safety management and control for the high slopes of open-pit mines in the coal mining process.
Effective high slope risk assessment plays an important role in the safety management and control of the open-pit coal mining process. Traditional slope stability risk assessment methods rarely consider the time factor or evaluate the dynamic change of high slope in an open-pit mine at a certain time in a sensitivity assessment. This paper develops an interval trapezoidal fuzzy soft set method to achieve the high slope dynamic risk evaluation. The proposed dynamic interval trapezoidal fuzzy soft set method for risk assessment of high slope in an open-pit coal mine is developed by integrating the time points and weights of slope risk factors. The extended interval trapezoidal fuzzy soft set was used to calculate the weights of risk factors at different times, and the Fuzzy Analytical Hierarchy Process (FAHP) method was applied to determine the weights of risk factors. The weight change of different risk factors with time can be easily achieved with the proposed method. As a case study, this approach is implemented into a risk assessment model for the north high slope in Shengli #1 open-pit mine located in Xilinhot, Inner Mongolia. The model complies with three time points and contains 4 primary risk factors (S) and 17 secondary risk factors. The results indicated that the hydrological climate conditions and slope geometry conditions were the high risk factors affecting this open-pit coal mine slope. The reasonability and effectiveness of the evaluation results were verified with in-situ observations and measurements. This dynamic risk assessment method is helpful for improving safety management and control for the high slopes of open-pit mines in the coal mining process.
Record ID
Keywords
dynamic risk assessment, high slope, open-pit coalmine, safety management and control
Suggested Citation
Wang Z, Hu M, Zhang P, Li X, Yin S. Dynamic Risk Assessment of High Slope in Open-Pit Coalmines Based on Interval Trapezoidal Fuzzy Soft Set Method: A Case Study. (2023). LAPSE:2023.0650
Author Affiliations
Wang Z: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China [ORCID]
Hu M: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China
Zhang P: CHN Baorixile Energy Co., Ltd., Hulunbuir 021599, China
Li X: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China
Yin S: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China
Hu M: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China
Zhang P: CHN Baorixile Energy Co., Ltd., Hulunbuir 021599, China
Li X: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China
Yin S: School of Civil Engineering and Architecture, Zhongyuan University of Technology, Zhengzhou 450007, China
Journal Name
Processes
Volume
10
Issue
11
First Page
2168
Year
2022
Publication Date
2022-10-23
ISSN
2227-9717
Version Comments
Original Submission
Other Meta
PII: pr10112168, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.0650
This Record
External Link

https://doi.org/10.3390/pr10112168
Publisher Version
Download
Meta
Record Statistics
Record Views
197
Version History
[v1] (Original Submission)
Feb 20, 2023
Verified by curator on
Feb 20, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.0650
Record Owner
Auto Uploader for LAPSE
Links to Related Works
