LAPSE:2023.26580
Published Article

LAPSE:2023.26580
Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints
April 3, 2023
Abstract
The industry 4.0 concepts are moving towards flexible and energy efficient factories. Major flexible production lines use battery-based automated guided vehicles (AGVs) to optimize their handling processes. However, optimal AGV battery management can significantly shorten lead times. In this paper, we address the scheduling problem in an AGV-based job-shop manufacturing facility. The considered schedule concerns three strands: jobs affecting machines, product transport tasks’ allocations and AGV fleet battery management. The proposed model supports outcomes expected from Industry 4.0 by increasing productivity through completion time minimization and optimizing energy by managing battery replenishment. Experimental tests were conducted on extended benchmark literature instances to evaluate the efficiency of the proposed approach.
The industry 4.0 concepts are moving towards flexible and energy efficient factories. Major flexible production lines use battery-based automated guided vehicles (AGVs) to optimize their handling processes. However, optimal AGV battery management can significantly shorten lead times. In this paper, we address the scheduling problem in an AGV-based job-shop manufacturing facility. The considered schedule concerns three strands: jobs affecting machines, product transport tasks’ allocations and AGV fleet battery management. The proposed model supports outcomes expected from Industry 4.0 by increasing productivity through completion time minimization and optimizing energy by managing battery replenishment. Experimental tests were conducted on extended benchmark literature instances to evaluate the efficiency of the proposed approach.
Record ID
Keywords
automated guided vehicles, battery management, energy optimization, job-shop scheduling, transport constraints
Subject
Suggested Citation
Abderrahim M, Bekrar A, Trentesaux D, Aissani N, Bouamrane K. Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints. (2023). LAPSE:2023.26580
Author Affiliations
Abderrahim M: Laboratoire d’Informatique d’Oran (LIO), Université Oran1, Oran 31000, Algeria [ORCID]
Bekrar A: LAMIH, UMR CNRS 8201, UPHF, 59300 Valenciennes, France
Trentesaux D: LAMIH, UMR CNRS 8201, UPHF, 59300 Valenciennes, France [ORCID]
Aissani N: Laboratoire de l’Ingénierie de la Sécurité Industrielle et du Développement Durable, Université Oran2, Oran 31000, Algeria
Bouamrane K: Laboratoire d’Informatique d’Oran (LIO), Université Oran1, Oran 31000, Algeria [ORCID]
Bekrar A: LAMIH, UMR CNRS 8201, UPHF, 59300 Valenciennes, France
Trentesaux D: LAMIH, UMR CNRS 8201, UPHF, 59300 Valenciennes, France [ORCID]
Aissani N: Laboratoire de l’Ingénierie de la Sécurité Industrielle et du Développement Durable, Université Oran2, Oran 31000, Algeria
Bouamrane K: Laboratoire d’Informatique d’Oran (LIO), Université Oran1, Oran 31000, Algeria [ORCID]
Journal Name
Energies
Volume
13
Issue
18
Article Number
E4948
Year
2020
Publication Date
2020-09-21
ISSN
1996-1073
Version Comments
Original Submission
Other Meta
PII: en13184948, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.26580
This Record
External Link

https://doi.org/10.3390/en13184948
Publisher Version
Download
Meta
Record Statistics
Record Views
427
Version History
[v1] (Original Submission)
Apr 3, 2023
Verified by curator on
Apr 3, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.26580
Record Owner
Auto Uploader for LAPSE
Links to Related Works
(0.09 seconds)
[0.1 s]
