LAPSE:2023.1029v1
Published Article
LAPSE:2023.1029v1
Numerical Analysis of Grouting of Water-Enriched Karst Highway Tunnel Based on Critical Water-Enriched Height
Tao Hua, Shiyang Liu, Xuefu Zhang, Lianghua Meng, Pan Wang
February 21, 2023
Abstract
The occurrence state of groundwater in a karst area has a significant impact on the tunnel lining structure. The impact on the groundwater is more significant during construction. This paper used numerical simulation to study the grouting reinforcement range of the Liaoshan Tunnel. This was based on the critical water rich height. Under Grade IV and Grade V surrounding rock, the critical points of grouting reinforcement were 230 m and 240 m deep, respectively. The vertical and horizontal stress and seepage flow of the tunnel arch crown and invert decreased as the circumferential grouting reinforcement range increased. In the case of no grouting reinforcement, 1/4 circumferential grouting reinforcement, 1/2 circumferential grouting reinforcement, and all circumferential grouting reinforcement, the seepage flow was 7 m3/dm, 4 m3/dm, 3 m3/dm, and 0 m3/dm, respectively. With Grade V surrounding rock, when the groundwater level was 260−270 m away from the tunnel arch crown, two schemes could be adopted: 1 m radial grouting reinforcement and 1/2 circumferential grouting reinforcement. The results have guiding significance for developing a construction scheme of a karst water rich tunnel.
Keywords
critical water-enriched height, grouting, seepage field, water-enriched karst tunnel
Suggested Citation
Hua T, Liu S, Zhang X, Meng L, Wang P. Numerical Analysis of Grouting of Water-Enriched Karst Highway Tunnel Based on Critical Water-Enriched Height. (2023). LAPSE:2023.1029v1
Author Affiliations
Hua T: State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China; Chongqing Communications Construction (Group) Co., Ltd., Chongqing 401120, China
Liu S: State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China [ORCID]
Zhang X: State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China
Meng L: State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China
Wang P: State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074, China
Journal Name
Processes
Volume
11
Issue
1
First Page
149
Year
2023
Publication Date
2023-01-03
ISSN
2227-9717
Version Comments
Original Submission
Other Meta
PII: pr11010149, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2023.1029v1
This Record
External Link

https://doi.org/10.3390/pr11010149
Publisher Version
Download
Files
Feb 21, 2023
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
312
Version History
[v1] (Original Submission)
Feb 21, 2023
 
Verified by curator on
Feb 21, 2023
This Version Number
v1
Citations
Most Recent
This Version
URL Here
https://psecommunity.org/LAPSE:2023.1029v1
 
Record Owner
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version