LAPSE:2024.0593
Published Article
LAPSE:2024.0593
Well Shut-In Pressure Determination Method for Deepwater Drilling Considering Fluid-Solid-Heat Coupling
Yongqian Ma, Yang Ke, Huangang Zhu, Peng Zhao, Xueqi Liu, Xiaohui Sun, Zhiyuan Wang
June 5, 2024
Abstract
Blowout is one of the most serious safety threats in deepwater drilling. Considering the characteristics of gas invasion in complex formations, gas migration and distribution, and dynamic changes in temperature inside a wellbore, a deepwater well-closing pressure determination method considering thermal-fluid-solid coupling was proposed. The model was verified using actual data, and the average error in the increase in casing pressure during the closing process was found to be 5.42%. The shut-in pressure of oil and gas wells under a transient shut-in process was analyzed. The results showed that the fluid thermal expansion caused by temperature recovery had a significant impact on the change in wellhead backpressure after well closure. Furthermore, the time required for the wellbore pressure to recover to the formation pressure varies nonlinearly with factors such as geothermal gradients, pit gains, bottom-hole pressure, and gas production indices. A pressure calculation chart was developed for deepwater drilling. The shut-in time for deepwater drilling should not be less than 15 min, and in cases where the gas production index is small and the bottomhole pressure difference is large, the shut-in time should exceed 90 min. The results can provide theoretical guidance and technical support for well shut-in processes during deepwater drilling.
Keywords
deepwater drilling, heat-fluid-solid coupling, shut-in well pressure, well control
Suggested Citation
Ma Y, Ke Y, Zhu H, Zhao P, Liu X, Sun X, Wang Z. Well Shut-In Pressure Determination Method for Deepwater Drilling Considering Fluid-Solid-Heat Coupling. (2024). LAPSE:2024.0593
Author Affiliations
Ma Y: Drilling Technology Research Institute, Sinopec Shengli Petroleum Engineering Company Limited, Dongying 257001, China
Ke Y: School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266555, China
Zhu H: Drilling Technology Research Institute, Sinopec Shengli Petroleum Engineering Company Limited, Dongying 257001, China
Zhao P: Drilling Technology Research Institute, Sinopec Shengli Petroleum Engineering Company Limited, Dongying 257001, China
Liu X: School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266555, China
Sun X: School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266555, China
Wang Z: School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266555, China
Journal Name
Processes
Volume
12
Issue
4
First Page
739
Year
2024
Publication Date
2024-04-05
ISSN
2227-9717
Version Comments
Original Submission
Other Meta
PII: pr12040739, Publication Type: Journal Article
Record Map
Published Article

LAPSE:2024.0593
This Record
External Link

https://doi.org/10.3390/pr12040739
Publisher Version
Download
Files
Jun 5, 2024
Main Article
License
CC BY 4.0
Meta
Record Statistics
Record Views
677
Version History
[v1] (Original Submission)
Jun 5, 2024
 
Verified by curator on
Jun 5, 2024
This Version Number
v1
Citations
Most Recent
This Version
URL Here
http://psecommunity.org/LAPSE:2024.0593
 
Record Owner
Auto Uploader for LAPSE
Links to Related Works
Directly Related to This Work
Publisher Version
(0.11 seconds)

[0.11 s]